General References
DIKTAS
| City | : Istanbul |
| Process | : Chemical Treatment |
| Capacity | : 1000 m3/day |
| Construction Year | : 1987 |
KALE KILIT
| City | : Istanbul |
| Process | : Industrial ( Chemical ) Treatment |
| Capacity | : 50 m3/day |
| Construction Year | : 1987 |
IBER HOTEL AND HOLIDAY VILLAGE
| City | : Marmaris |
| Process | : Biological Treatment |
| Capacity | : 100 m3/day |
| Construction Year | : 1987 |
AL-ELOKS
| City | : Istanbul |
| Process | : Industrial ( Chemical ) Treatment |
| Capacity | : 5 m3/day |
| Construction Year | : 1988 |
MIMIR ALUMINIUM
| City | : Istanbul |
| Process | : Industrial ( Chemical ) Treatment |
| Capacity | : 20 m3/day |
| Construction Year | : 1988 |
KEMAHILER
| City | : Istanbul |
| Process | : Industrial ( Chemical ) Treatment |
| Capacity | : 22.5 m3/day |
| Construction Year | : 1988 |
BUROSAN
| City | : Istanbul |
| Process | : Industrial Treatment ( Chemical Treatment ) |
| Capacity | : 70 m3/day |
| Construction Year | : 1989 |
IPEK KNITTING FACTORY
| City | : Istanbul |
| Process | : Industrial Treatment ( Chemical Treatment ) |
| Capacity | : 1000 m3/day |
| Construction Year | : 1989 |
PALMEK
| City | : Istanbul |
| Process | : Industrial Treatment ( Chemical Treatment ) |
| Capacity | : 100 m3/day |
| Construction Year | : 1989 |
MIMAYSAN
| City | : Istanbul |
| Process | : Industrial Treatment ( Chemical Treatment ) |
| Capacity | : 7 m3/day |
| Construction Year | : 1989 |
FAKO MEDICINE
| City | : Istanbul |
| Process | : Industrial Treatment ( Chemical + Biological Treatment) |
| Capacity | : 60 m3/day |
| Construction Year | : 1989 |
| City | : Istanbul |
| Process | : Biological Treatment |
| Capacity | : 115 m3/day |
| Construction Year | : 1992 |
| City | : Istanbul |
| Process | : Industrial Treatment (Biological Treatment) |
| Capacity | : 115 m3/day |
| Construction Year | : 1992 |
KAPSAN
| City | : Istanbul |
| Process | : Industrial Treatment ( Chemical Treatment) |
| Capacity | : 10 m3/day |
| Construction Year | : 1990 |
HASEL ALUMINIUM
| City | : Istanbul |
| Process | : Industrial Treatment ( Chemical Treatment) |
| Capacity | : 4 m3/day |
| Construction Year | : 1990 |
BILGE METAL
| City | : Istanbul |
| Process | : Industrial Treatment ( Chemical Treatment ) |
| Capacity | : 4 m3/day |
| Construction Year | : 1990 |
ECZACIBASI ANTIBIOTICS
| City | : Istanbul |
| Process | : Industrial Treatment ( Chemical + Biological + Chemical Treatment ) |
| Capacity | : 60 m3/day |
| Construction Year | : 1990 |
CEKMECE SLAUGTERHOUSE
| City | : Istanbul |
| Process | : Industrial Treatment ( 2 Step Biological Treatment ) |
| Capacity | : 300 m3/day |
| Construction Year | : 1991 |
AYYILDIZ
| City | : Istanbul |
| Process | : Industrial Treatment ( Chemical Treatment ) |
| Capacity | : 30 m3/day |
| Construction Year | : 1991 |
GULER
| City | : Istanbul |
| Process | : Industrial Treatment ( Chemical Treatment ) |
| Capacity | : 25 m3/day |
| Construction Year | : 1991 |
OGRETMEN SOCKS FACTORY
| City | : Istanbul |
| Process | : Industrial Treatment ( Chemical Treatment ) |
| Capacity | : 20 m3/day |
| Construction Year | : 1991 |
VANLEER
| City | : Gebze |
| Process | : Industrial Treatment ( Chemical Treatment) |
| Capacity | : 20 m3/day |
| Construction Year | : 1991 |
KELKIT MATCHMAKING FACTORY
| City | : Gebze |
| Process | : Industrial Treatment ( Chemical Treatment ) |
| Capacity | : 5 m3/day |
| Construction Year | : 1991 |
FMC-NUROL
| City | : Ankara |
| Process | : Industrial Treatment ( Chemical Treatment) |
| Capacity | : 50 m3/h |
| Construction Year | : 1991 |
EMBIL MEDICINE
| City | : Istanbul |
| Process | : Industrial Treatment ( Chemical Treatment) |
| Capacity | : 10 m3/day |
| Construction Year | : 1991 |
KROMAN STEEL A.C.
| City | : Istanbul |
| Process | : Biological Treatment |
| Capacity | : 40 m3/day |
| Construction Year | : 1992 |
| City | : Istanbul |
| Process | : Industrial Treatment ( Chemical Treatment) |
| Capacity | : 40 m3/day |
| Construction Year | : 1992 |
| City | : Kocaeli |
| Process | : Biological Treatment |
| Capacity | : 60 m3/day |
| Construction Year | : 1997 |
| City | : Istanbul |
| Process | : Biological Treatment |
| Capacity | : 10 m3/day |
| Construction Year | : 1997 |
| City | : Kocaeli |
| Process | : Biological Treatment |
| Capacity | : 40 m3/day |
| Construction Year | : 1997 |
| City | : Gebze |
| Process | : Biological Treatment |
| Capacity | : 15 m3/day |
| Construction Year | : 2001 |
CELIK MONTAGE IND. VE TRA. A.C.
| City | : Istanbul |
| Process | : Industrial Treatment ( Chemical Treatment) |
| Capacity | : 5 m3/day |
| Construction Year | : 1992 |
ANTALYA AIRPORT
| City | : Antalya |
| Process | : Biological Treatment |
| Capacity | : 40 m3/day |
| Construction Year | : 1992 |
S.S.GULCIMEN RESIDENTAL BUILDING SOCIETY
| City | : Antalya |
| Process | : Biological Treatment |
| Capacity | : 10 m3/day |
| Construction Year | : 1992 |
NOBEL MEDICINE
| City | : Istanbul |
| Process | : Industrial Treatment ( Chemical Treatment) |
| Capacity | : 25 m3/day |
| Construction Year | : 1992 |
| City | : Istanbul |
| Process | : Industrial Treatment ( Chemical Treatment) |
| Capacity | : 25 m3/day |
| Construction Year | : 1993 |
YALOVA FIBER AND YARN FACTORY
| City | : Yalova |
| Process | : Industrial Treatment ( Chemical + Biological Treatment) |
| Capacity | : 2000 m3/day |
| Construction Year | : 1992 |
GOKCENTEKS TEXTILE IND. VE TRA. A.C.
| City | : Bursa |
| Process | : Industrial Treatment ( Chemical Treatment) |
| Capacity | : 5000 m3/day |
| Construction Year | : 1992 |
TISAN MECANICS
| City | : Istanbul |
| Process | : Biological Treatment |
| Capacity | : 5 m3/day |
| Construction Year | : 1992 |
BULUTCULAR OIL IND. VE TRA.LTD.STI.
| City | : Edirne |
| Process | : Biological Treatment |
| Capacity | : 10 m3/day |
| Construction Year | : 1992 |
S.S.PARILTI RESIDENTAL BUILDING SOCIETY
| City | : Gemlik |
| Process | : Biological Treatment |
| Capacity | : 80 m3/day |
| Construction Year | : 1993 |
SUMAK LTD.STI.
| City | : Yalova |
| Process | : Biological Treatment |
| Capacity | : 30 m3/day |
| Construction Year | : 1993 |
SARAY CHOCOLATE AND CANDY A.C.
| City | : Istanbul |
| Process | : Industrial Treatment ( Chemical + Biological Treatment) |
| Capacity | : 5 m3/day |
| Construction Year | : 1993 |
TOPKIM – TOPKAPI MEDICINE PREMIX IND. A.C.
| City | : Istanbul |
| Process | : Industrial Treatment ( Chemical Treatment) |
| Capacity | : 5 m3/day |
| Construction Year | : 1993 |
S.S.ORKIDE RESIDENTAL BUILDING SOCIETY
| City | : Saroz |
| Process | : Biological Treatment |
| Capacity | : 400 m3/day |
| Construction Year | : 1993 |
BARTIN ANATOLIAN HIGH SCHOOL
| City | : Bartin |
| Process | : Biological Treatment |
| Capacity | : 400 m3/day |
| Construction Year | : 1993 |
S.S.SAROZ SEA HOUSES RESIDENTAL BUILDING SOCIETY
| City | : Saroz |
| Process | : Biological Treatment |
| Capacity | : 100 m3/day |
| Construction Year | : 1993 |
CAY ISLETMELERI CHIEF MANAGEMENT ULUCAMI TEA FACTORY
| City | : Rize |
| Process | : Biological Treatment |
| Capacity | : 112 m3/day |
| Construction Year | : 1993 |
ÇAY ISLETMELERI CHIEF MANAGEMENT DAYEYSU TEA FACTORY
| City | : Rize |
| Process | : Biological Treatment |
| Capacity | : 90 m3/day |
| Construction Year | : 1993 |
ÇAY ISLETMELERI CHIEF MANAGEMENT PAZARKOY TEA FACTORY
| City | : Rize |
| Process | : Biological Treatment |
| Capacity | : 60 m3/day |
| Construction Year | : 1993 |
EGE BRAKE DISC IND. VE TRA. A.C.
| City | : Izmir |
| Process | : Industrial Treatment ( Chemical Treatment ) |
| Capacity | : 5 m3/day |
| Construction Year | : 1994 |
| City | : Izmir |
| Process | : Biological Treatment |
| Capacity | : 5 m3/day |
| Construction Year | : 1994 |
| Process | : Biological Treatment |
| Capacity | : 20 m3/day |
| Construction Year | : 1996 |
TURKEY BOTTLE AND GLASS FACTORY A.C. PASABAHCE GLASS FACTORY
| City | : Istanbul |
| Process | : Pre-Filtration Demineralization System |
| Capacity | : 10 m3/h |
| Construction Year | : 1994 |
MED UNION CONTAINERS A.C.
| City | : Izmir |
| Process | : Reverse Osmosis System |
| Capacity | : 6 m3/h |
| Construction Year | : 1994 |
| Process | : Industrial Treatment ( Chemical Treatment) |
| Capacity | : 6 m3/day |
| Construction Year | : 1994 |
| Process | : Biological Treatment |
| Capacity | : 120 m3/day |
| Construction Year | : 1994 |
AYKIM CHEMICALS
| City | : Aydın |
| Process | : Recycle Type Demineralization System |
| Capacity | : 3 m3/h |
| Construction Year | : 1994 |
| City | : Istanbul |
| Process | : Industrial Treatment ( Chemical Treatment) |
| Capacity | : 360 m3/day |
| Construction Year | : 1994 |
DURAN OFSET PRINTING HOUSE AND PACKING IND.
| City | : Istanbul |
| Process | : Industrial Treatment ( Chemical Treatment ) |
| Capacity | : 5 m3/day |
| Construction Year | : 1994 |
S.S.BODRUM AKYARLAR NAGME COAST RESIDENTAL BUILDING SOCIETY
| City | : Bodrum |
| Process | : Biological Treatment |
| Capacity | : 400 m3/day |
| Construction Year | : 1994 |
SAHARTEPE RESIDENTAL BUILDING SOCIETY
| City | : Bodrum |
| Process | : Biological Treatment |
| Capacity | : 160 m3/day |
| Construction Year | : 1994 |
S.S.ISKENDERUN AKDENIZ DAYES RESIDENTAL BUILDING SOCIETY
| City | : Iskenderun |
| Process | : Biological Treatment |
| Capacity | : 120 m3/day |
| Construction Year | : 1994 |
S.S.OZGEYIKLI COAST RESIDENTAL BUILDING SOCIETY
| City | : Canakkale |
| Process | : Biological Treatment |
| Capacity | : 100 m3/day |
| Construction Year | : 1994 |
DERYA RESIDENTAL SITE
| City | : Gemlik |
| Process | : Biological Treatment |
| Capacity | : 30 m3/day |
| Construction Year | : 1994 |
S.S.MELIS RESIDENTAL BUILDING SOCIETY
| City | : Iskenderun |
| Process | : Biological Treatment |
| Capacity | : 50 m3/day |
| Construction Year | : 1995 |
MURAT TEXTILE IND. TRA. A.C.
| City | : Edirne |
| Process | : Biological Treatment |
| Capacity | : 80 m3/day |
| Construction Year | : 1995 |
PERAL A.C. CONTINENT HARAMIDERE HYPERMARKET
| City | : Istanbul |
| Process | : Biological Treatment |
| Capacity | : 80 m3/day |
| Construction Year | : 1995 |
| Process | : Drinking Water Treatment System |
| Capacity | : 3 m3/h |
| Construction Year | : 1995 |
S.S.BODRUM EGE RESIDENTAL BUILDING SOCIETY
| City | : Bodrum |
| Process | : Biological Treatment |
| Capacity | : 240 m3/day |
| Construction Year | : 1995 |
TURIMA TOURISM CONSTRUCTION SUPLLIES A.C.
| City | : Altınoluk |
| Process | : Biological Treatment |
| Capacity | : 50 m3/day |
| Construction Year | : 1995 |
S.S. GOKKUSAGI RESIDENTAL BUILDING SOCIETY
| City | : Iskenderun |
| Process | : Biological Treatment |
| Capacity | : 100 m3/day |
| Construction Year | : 1995 |
INTERMART CONSTRUCTION SUPLLIES IND. Ve TRA. A.C.
| City | : CerkezkOy |
| Process | : Industrial Treatment ( Chemical Treatment) |
| Capacity | : 2 m3/h |
| Construction Year | : 1995 |
MUNIR SAHIN MEDICINE IND. A.C.
| City | : Istanbul |
| Process | : Biological Treatment ( Revizyon ) |
| Capacity | : 15 m3/day |
| Construction Year | : 1995 |
ALARKO CARRIER IND.TRA.A.C. ALPOM FACTORY
| City | : Istanbul |
| Process | : Industrial Treatment ( Chemical Treatment ) |
| Capacity | : 3 m3/h |
| Construction Year | : 1995 |
| Process | : Recycle Type Demineralization System |
| Capacity | : 2 m3/h |
| Construction Year | : 1995 |
| Process | : Recycle Type Demineralization System |
| Capacity | : 3 m3/h |
| Construction Year | : 2005 |
| Process | : Industrial Treatment ( Chemical Treatment ) |
| Capacity | : 5 m3/h |
| Construction Year | : 2005 |
TEKIMSAN CHEMICALS IND. ve TRA. A.C.
| City | : Istanbul |
| Process | : Industrial Treatment ( Biological + Chemical Treatment) |
| Capacity | : 20 m3/day |
| Construction Year | : 1995 |
OTOKAR BUS CHASSIS IND. A.C.
| City | : Arifiye |
| Process | : Industrial Treatment (Chemical Treatment) |
| Capacity | : 5 m3/day |
| Construction Year | : 1995 |
| Process | : Industial Wastewater Treatment + Filtration System |
| Capacity | : 2 m3/h |
| Construction Year | : |
| Process | : Tandem Demineralization System |
| Capacity | : 2 m3/h |
| Construction Year | : 1999 |
| Process | : Recycle Type Demineralization System |
| Capacity | : 2 m3/h – Tandem |
| Construction Year | : 1999 |
| Process | : Iron-Manganese Removal and Softening System |
| Capacity | : 10 m3/h |
| Construction Year | : 2002 |
MEDYA HOLDING
| City | : Istanbul |
| Process | : Industrial Treatment (Biological + Chemical Treatment ) |
| Capacity | : 60 m3/day |
| Construction Year | : 1995 |
ORDU ALTILAR RESIDENTAL SITE
| City | : Ordu |
| Process | : Biological Treatment |
| Capacity | : 10 m3/day |
| Construction Year | : 1995 |
T.P.A.O. GENERAL MANAGEMENT
| City | : Ankara |
| Process | : Biological Treatment |
| Capacity | : 200 m3/day |
| Construction Year | : 1995 |
KATAR CONSTRUCTION&ELECTRIC SYSTEMS LTD.STI.
| City | : Adana |
| Process | : Biological Treatment |
| Capacity | : 60 m3/day |
| Construction Year | : 1995 |
S.S. MARINE COAST RESIDENTAL BUILDING SOCIETY
| City | : Canakkale |
| Process | : Biological Treatment |
| Capacity | : 20 m3/day |
| Construction Year | : 1995 |
S.S.SEDA RESIDENTAL BUILDING SOCIETY
| City | : İskenderun |
| Process | : Biological Treatment |
| Capacity | : 40 m3/day |
| Construction Year | : 1995 |
MUMCULAR TOURISM IND.A.C.
| City | : Çanakkale |
| Process | : Biological Treatment |
| Capacity | : 180 m3/day |
| Construction Year | : 1995 |
CEBITAS IRON&STEEL INDUSTRY A.C.
| City | : Izmir |
| Process | : Biological Treatment |
| Capacity | : 100 m3/day |
| Construction Year | : 1995 |
| City | : Istanbul |
| Process | : Biological Treatment |
| Capacity | : 60 m3/day |
| Construction Year | : 1995 |
INTERMART DUSAKABIN SYSTEMS CERKEZKOY FACTORY
| City | : Çerkezköy |
| Process | : Recycle Type Demineralization System |
| Capacity | : 1 m3/h |
| Construction Year | : 1995 |
MEDYA PLAZA II
| City | : Istanbul |
| Process | : Industrial and DomesTRA. Wastewater Treatment + Filtration Unit |
| Capacity | : 20 m3/h |
| Construction Year | : 1995 |
DEMSAS METAL IND.TRA.A.C.
| City | : Silivri |
| Process | : Recycle Type Demineralization System |
| Capacity | : 3 m3/h |
| Construction Year | : 1995 |
| Process | : Tandem Type Softening System |
| Capacity | : 3 m3/h |
| Construction Year | : 1995 |
BILKENT HOLDING
| City | : Ankara |
| Process | : Dealkalization System |
| Capacity | : 6 m3/h |
| Construction Year | : 1995 |
GENCER ALUMINIUM IND.TRA.A.C.
| City | : Istanbul |
| Process | : Recycle Type Demineralization System |
| Capacity | : 5 m3/h |
| Construction Year | : 1995 |
TURKEY BOTTLE AND GLASS FACTORY A.C. KIRKLARELI FACTORY
| City | : Kırklareli |
| Process | : Pre Filter Demineralization System |
| Capacity | : 10 m3/h – Tandem |
| Construction Year | : 1995 |
| Process | : Industrial Treatment (Chemical Treatment) |
| Capacity | : 300 m3/day |
| Construction Year | : 1998 |
BEYBO TEKSTIL IND.TRA.A.C.
| City | : Corlu |
| Process | : Boiler Feed Water to Prepare Foundation |
| Capacity | : 7.5 m3/h |
| Construction Year | : 1995 |
ALTAS ALUMINIUM IND.TRA.A.C.
| City | : Istanbul |
| Process | : Recycle Type Demineralization System |
| Capacity | : 5 m3/h – Tandem |
| Construction Year | : 1995 |
E&H ARUTAN CONSTRUCTION TRA.IND.A.C.
| City | : Merzifon |
| Process | : Biological Treatment |
| Capacity | : 3×40 m3/day |
| Construction Year | : 1995 |
| City | : Merzifon Nato 5. Main Jet Base |
| Process | : Biological Treatment |
| Capacity | : 40 m3/day |
| Construction Year | : 1996 |
| City | : Merzifon Nato 5.Main Jet Base |
| Process | : Biological Treatment |
| Capacity | : 60 m3/day |
| Construction Year | : 1997 |
| City | : Merzifon Nato 5.Main Jet Base |
| Process | : Biological Treatment |
| Capacity | : 100 m3/day |
| Construction Year | : 1997 |
FENIS ALUMINIUM IND.TRA.A.C.
| City | : Istanbul |
| Process | : Recycle Type Demineralization System |
| Capacity | : 5 m3/h – Tandem |
| Construction Year | : 1995 |
| Process | : Recycle Type Demineralization System |
| Capacity | : 2 m3/h |
| Construction Year | : 1997 |
MAHYA REFIGERATOR FACTORY
| City | : Iran |
| Process | : Recycle Type Demineralization System |
| Capacity | : 5 m3/h |
| Construction Year | : 1995 |
KONSAN JUICE AND FOOD IND.A.C.
| City | : Antalya |
| Process | : Boiler Feed Water to Prepare Foundation |
| (Sand Filter+Softening) | |
| Capacity | : 5 m3/h |
| Construction Year | : 1996 |
ALKE CONSTRUCTION ANTALYA AQUA PARK
| City | : Antalya |
| Process | : Biological Treatment |
| Capacity | : 60 m3/day |
| Construction Year | : 1996 |
ILSIM TOURISM SOCIETY
| City | : Izmir |
| Process | : Biological Treatment |
| Capacity | : 300 m3/day |
| Construction Year | : 1996 |
ONUR RESIDENTAL BUILDING SOCIETY
| City | : İskenderun |
| Process | : Biological Treatment |
| Capacity | : 100 m3/day |
| Construction Year | : 1996 |
BES MACHINES IND. ve TRA. A.C.
| City | : Istanbul |
| Process | : Industrial Treatment (Chemical Treatment) |
| Capacity | : 24 m3/day |
| Construction Year | : 1996 |
YILDIZ TEXTILE
| City | : Istanbul |
| Process | : Industrial Treatment (Chemical Treatment) |
| Capacity | : 60 m3/day |
| Construction Year | : 1996 |
E.C.A. VALVES AND FITTINGS IND. A.C.
| City | : Edirne |
| Process | : Industrial Treatment (Chemical Treatment) |
| Capacity | : 10 m3/h |
| Construction Year | : 1996 |
| Process | : Recycle Type Demineralization System |
| Capacity | : 15 m3/h – Tandem |
| Construction Year | : 1996 |
KONVEYOR IND. LTD. STI.
| City | : Istanbul |
| Process | : Industrial Treatment (Chemical Treatment) |
| Capacity | : 13 m3/day |
| Construction Year | : 1996 |
TUDEMSAS TURKEY RAILWAY MACHINES IND. A.C.
| City | : Sivas |
| Process | : Industrial Treatment (Chemical Treatment) |
| Capacity | : 6 m3/day 4 m3/day |
| Construction Year | : 1996 |
3 ISIK A.C. PINOKYO HOLIDAY VILLAGE
| City | : Bodrum |
| Process | : Biological Treatment |
| Capacity | : 60 m3/day |
| Construction Year | : 1996 |
STEMED STERILIZATION AND MEDICAL SUPPLIES TRA.LTD.STI.
| City | : Ankara |
| Process | : Biological Treatment |
| Capacity | : 20 m3/day |
| Construction Year | : 1996 |
OZMERCAN RESIDENTAL BUILDING SOCIETY
| City | : Saroz |
| Process | : Biological Treatment |
| Capacity | : 60 m3/day |
| Construction Year | : 1996 |
ESKI DOSTLAR RESIDENTAL BUILDING SOCIETY
| City | : Balıkesir |
| Process | : Biological Treatment |
| Capacity | : 20 m3/day |
| Construction Year | : 1996 |
UMIT TECIMER VILLAGES
| City | : Antalya |
| Process | : Biological Treatment |
| Capacity | : 10 m3/day |
| Construction Year | : 1996 |
HANTEPE RESIDENTAL BUILDING SOCIETY
| City | : Canakkale |
| Process | : Biological Treatment |
| Capacity | : 300 m3/day |
| Construction Year | : 1996 |
FIRAT PLASTIC RUBBES IND. VE TRA. A.C.
| City | : Istanbul |
| Process | : Biological Treatment |
| Capacity | : 60 m3/day |
| Construction Year | : 1996 |
INTERNATIONAL TOURISM
| City | : Adapazarı |
| Process | : Biological Treatment |
| Capacity | : 40 m3/day |
| Construction Year | : 1996 |
| Process | : Biological Treatment |
| Capacity | : 60 m3/day |
| Construction Year | : 1996 |
S.S. ALTINOZGE RESIDENTAL BUILDING SOCIETY
| City | : Canakkale |
| Process | : Biological Treatment |
| Capacity | : 60 m3/day |
| Construction Year | : 1996 |
S.S.CANAKKALE CIMENTO MENSUPLARI RESIDENTAL BUILDING SOCIETY
| City | : Canakkale |
| Process | : Biological Treatment |
| Capacity | : 40 m3/day |
| Construction Year | : 1996 |
KARAMEHMETLER FUEL-OIL RECREATIONAL FACILITIES
| City | : Afyon |
| Process | : Biological Treatment |
| Capacity | : 80 m3/day |
| Construction Year | : 1996 |
FORA TEXTILE IND. TRA. A.C.
| City | : Istanbul |
| Process | : Textile Dye-House Water Prepare System |
| (Pre Filter+Reverse Osmosis System | |
| Capacity | : 6 m3/h |
| Construction Year | : |
MODERN KARTON IND. ve TRA. A.C.
| City | : Çorlu |
| Process | : Pre-Filtration + Demineralization System |
| Capacity | : 130 m3/h – Tandem |
| Construction Year | : 1996 |
| Process | : Pre-Filtration + Demineralization System |
| Capacity | : 37 m3/h – Tandem |
| Construction Year | : |
ARUTAN BAYRAMOGLU VILLAGE
| City | : Istanbul |
| Process | : Biological Treatment |
| Capacity | : 5 m3/day |
| Construction Year | : 1996 |
| City | : Ankara |
| Process | : Biological Treatment |
| Capacity | : 20 m3/day |
| Construction Year | : 1996 |
KARTALLAR RESIDENTAL SITES
| City | : Bodrum |
| Process | : Biological Treatment |
| Capacity | : 10 m3/day |
| Construction Year | : 1996 |
MURAT RESIDENTAL SITES
| City | : Gebze |
| Process | : Biological Treatment |
| Capacity | : 80 m3/day |
| Construction Year | : 1996 |
ERCIYES HEAT IND. A.C.
| City | : Antalya |
| Process | : Boiler Feed Water to Prepare Foundation (Softening) |
| Capacity | : 5 m3/h |
| Construction Year | : 1996 |
SEROMA TEXTILE IND.TRA.LTD.STI.
| City | : Usak |
| Process | : Boiler Feed Water to Prepare Foundation (Softening) |
| Capacity | : 2 m3/h |
| Construction Year | : 1996 |
DESA ENERGY OTOPRODUCTION GROUP A.C.
| City | : Izmir |
| Process | : Pre Treatment Unit+Reverse Osmosis System+Degasser+ |
| Mix-bed System | |
| Capacity | : 10 m3/h |
| Construction Year | : 1996 |
TURKEY BOTTLE AND GLASS FACTORY A.C. MERSIN GLASS FACTORY
| City | : Mersin |
| Process | : Pre Filtration + Demineralization System |
| Capacity | : 15 m3/h – Tandem |
| Construction Year | : 1996 |
DATÇA CAPITAL SETTLEMENT
| Place | : Datca |
| Process | : Biological Treatment System |
| Capacity | : 30 m3/day |
| Construction Year | : 1996 |
HOTEL UCEL
| Place | : Fethiye |
| Process | : Biological Treatment System |
| Capacity | : 60 m3/day |
| Construction Year | : 1997 |
KONCAM CRYSTA GLASS IND.A.C.
| City | : Konya |
| Process | : Biological Treatment |
| Capacity | : 60 m3/day |
| Construction Year | : 1997 |
ARSEVEN RESIDENTAL BUILDING SOCIETY
| City | : Pendik |
| Process | : Industrial Treatment (Chemical Treatment) |
| Capacity | : 6 m3/day |
| Construction Year | : 1997 |
CELIKLER ALUMINIUM SANAYI A.C.
| City | : Istanbul |
| Process | : Industrial Treatment (Chemical Treatment) |
| Capacity | : 2 m3/h |
| Construction Year | : 1997 |
| Process | : Recycle Type Demineralization System |
| Capacity | : 4 m3/h |
| Construction Year | : 1997 |
EFES CERAMICS IND. TRA. A.C.
| City | : Eskisehir |
| Process | : Industrial Treatment (Chemical Treatment) |
| Capacity | : 300 m3/day |
| Construction Year | : 1997 |
YUZEY METAL
| City | : Istanbul |
| Process | : Industrial Treatment (Chemical Treatment) |
| Capacity | : 20 m3/day |
| Construction Year | : 1997 |
COLGATE – PALMOLIVE CLEANNESS PRODUCT IND.TRA.A.C.
| City | : Gebze |
| Process | : Pre Filter-Dosing Unit + Tandem Sand Filter + |
| Tandem Activated Carbon Filter+Tandem Softening System | |
| Capacity | : 15 m3/h |
| Construction Year | : 1997 |
| Process | : Double Rank Reverse Osmosis System |
| Capacity | : 8 m3/h |
| Construction Year | : 1997 |
TOFAS TURKEY AUTOMOTIVE A.C.
| City | : Bursa |
| Process | : Activated Carbon Filter |
| Capacity | : 50 m3/h – Tandem |
| Construction Year | : |
| City | : Yozgat |
| Process | : Boiler Feed Water to Prepare Foundation |
| (Pre Treatment Unit+Tandem Softening System+Reverse | |
| Osmosis System) | |
| Capacity | : 15 m3/h |
| Construction Year | : 1997 |
TURKEY SUGAR FACTORY A.C. ANKARA SUGAR FACTORY
| City | : Ankara |
| Process | : Boiler Feed Water to Prepare Foundation |
| (Pre Treatment Unit+Tandem Softening System+Reverse | |
| Osmosis System) | |
| Capacity | : 15 m3/h |
| Construction Year | : |
TURKEY SUGAR FACTORY A.C. HORZEM SUGAR FACTORY
| City | : Uzbekistan |
| Process | : Boiler Feed Water to Prepare Foundation |
| (Pre Treatment Unit+Tandem Softening System+2 Steps Reverse Osmosis System) | |
| Capacity | : 30 m3/h |
| Construction Year | : 1997 |
AABSAL
| City | : Persia |
| Process | : Recycle Type Demineralization System |
| Capacity | : 5 m3/h – Tandem |
| Construction Year | : 1997 |
| Process | : Industrial Treatment (Chemical Treatment) |
| Capacity | : 2 m3/h |
| Construction Year | : 1997 |
CEKISAN LTD. STI.
| City | : Istanbul |
| Process | : Industrial Treatment (Chemical Treatment) |
| Capacity | : 20 m3/day |
| Construction Year | : 1997 |
OZYASARLAR WIRE ve GALVANIZE IND. A.C.
| City | : Silivri – Istanbul |
| Process | : Industrial Treatment (Chemical Treatment) |
| Capacity | : 80 m3/day |
| Construction Year | : 1997 |
PELKA ELECTRIC SUPPLIES IND.A.C.
| City | : Ankara |
| Process | : Biological Treatment |
| Capacity | : 20 m3/day |
| Construction Year | : 1997 |
AVRUPA KENT RESIDENTAL BUILDING SOCIETY
| City | : Edirne |
| Process | : Biological Treatment |
| Capacity | : 160 m3/day |
| Construction Year | : 1997 |
ARI CONSTRUCTION SIVAS GEMEREK HOSPITAL
| City | : Sivas |
| Process | : Biological Treatment |
| Capacity | : 40 m3/day |
| Construction Year | : 1997 |
AKKIM CHEMICALS IND.A.C.
| City | : Yalova |
| Process | : Biological Treatment |
| Capacity | : 40 m3/day |
| Construction Year | : 1997 |
| City | : Çerkezkoy |
| Process | : Biological Treatment |
| Capacity | : 10 m3/day |
| Construction Year | : 2001 |
SARUHAN A.C.
| City | : Corlu |
| Process | : Industrial (Chemical)Treatment |
| Capacity | : 2 m3/h |
| Construction Year | : 1997 |
DEVA HOLDING A.C.
| City | : Istanbul |
| Process | : Industrial Treatment (Chemical Treatment) |
| Capacity | : 4 m3/h |
| Construction Year | : 1997 |
GAMA CONSTRUCTION A.C.
| City | : Turkmenistan Turkmenbasi Rafinery |
| Process | : Biological Treatment |
| Capacity | : 100 m3/day |
| Construction Year | : 1997 |
EDIRNE CLOTHING INDUSTRY A.C.
| Place | : Edirne |
| Process | : Biological Treatment System |
| Capacity | : 60 m3/day |
| Construction Year | : 1997 |
CIHAN CONSTRUCTION A.C.
| Place | : Tekirdag |
| Process | : Biological Treatment System |
| Capacity | : 200 m3/day |
| Construction Year | : 1997 |
CAN AKSIN VILLAGE
| Place | : Istanbul |
| Process | : Biological Treatment System |
| Capacity | : 10 m3/day |
| Construction Year | : 1997 |
ASSAN IRON AND SHEET IRON IND. A.C.
| Place | : Istanbul |
| Process | : Industial Treatment System (Chemical Treatment) |
| Capacity | : 25 m3/day |
| Construction Year | : 1997 |
CARLO ERBA MEDICINE IND. TRA. A.C.
| City | : Istanbul |
| Process | : Industrial Treatment (Chemical Treatment) |
| Capacity | : 3 m3/h |
| Construction Year | : 1998 |
KOLUMAN MOTOR VEHICLES A.C.
| City | : Istanbul |
| Process | : Industrial Treatment (Chemical Treatment) |
| Capacity | : 14 m3/day |
| Construction Year | : 1998 |
| Process | : Biological Treatment |
| Capacity | : 63 m3/day |
| Construction Year | : 1998 |
TEZMAK
| City | : Istanbul |
| Process | : Industrial Treatment (Chemical Treatment) |
| Capacity | : 7 m3/day |
| Construction Year | : 1998 |
SHOW TEXTILE
| City | : Istanbul |
| Process | : Industrial Treatment (Chemical Treatment) |
| Capacity | : 60 m3/day |
| Construction Year | : 1998 |
ALBAYRAK TOURISM CON. TRA.. A.C.
| City | : Istanbul |
| Process | : Industrial Treatment (Package Oil Remuve System) |
| Capacity | : 20 m3/day |
| Construction Year | : 1998 |
BORAL ALUMINIUM
| City | : Istanbul |
| Process | : Industrial Treatment (Chemical Treatment) |
| Capacity | : 96 m3/day |
| Construction Year | : 1998 |
| City | : Gebze |
| Process | : Biological Treatment |
| Capacity | : 60 m3/day |
| Construction Year | : 1998 |
| City | : Gebze |
| Process | : Recycle Type Demineralization System |
| Capacity | : 3 m3/h |
| Construction Year | : 1998 |
TURKEY BOTTLE AND GLASS FACTORY A.C. ESKISEHIR FACTORY
| City | : Eskişehir |
| Process | : Industrial Treatment (Chemical Treatment) |
| Capacity | : 15.4 m3/h |
| Construction Year | : 1998 |
| Process | : Pre Treatment+Reverse Osmosis System+Mix-bed System |
| Capacity | : 12 m3/h |
| Construction Year | : 1998 |
| Process | : Dezenfection+Tandem Sand Fitler |
| Capacity | : 50 m3/h |
| Construction Year | : 1998 |
| Process | : Tandem Softening System |
| Capacity | : 20 m3/h |
| Construction Year | : 1998 |
HURPA RESIDENTAL BUILDING SOCIETY
| City | : Bodrum |
| Process | : Biological Treatment |
| Capacity | : 160 m3/day |
| Construction Year | : 1998 |
YESIL VADI YAPI KOOPERATİFİ
| City | : Istanbul |
| Process | : Biological Treatment |
| Capacity | : 100 m3/day |
| Construction Year | : 1998 |
TERMAL SERAMIK IND. VE TRA.. A.C.
| City | : Bilecik |
| Process | : Industrial Treatment (Chemical Treatment) |
| Capacity | : 400 m3/day |
| Construction Year | : 1998 |
TEKEL CANAKKALE KANYAK FACTORY
| City | : Çanakkale |
| Process | : Pre Filtration + Softening + Reverse Osmosis System |
| Capacity | : 7 m3/h + 5 m3/h + 1 m3/h |
| Construction Year | : 1998 |
SITTNAK INTERNATIONA SHIPPING A.C.
| City | : Istanbul |
| Process | : Potable and Drinkinging Wather Treatment System+Reverse Osmosis System |
| Capacity | : 3 m3/h |
| Construction Year | : 1998 |
OTOYOL FACTORY
| City | : Istanbul |
| Process | : Recycle Type Demineralization System |
| Capacity | : 2 m3/h |
| Construction Year | : 1998 |
COŞKUNOZ IND.TRA..A.C.
| City | : Bursa |
| Process | : Recycle Type Demineralization System |
| Capacity | : 2 m3/h |
| Construction Year | : 1998 |
KOR METAL A.C.
| City | : Istanbul |
| Process | : Industrial Treatment (Chemical Treatment) |
| Capacity | : 5 m3/day |
| Construction Year | : 1998 |
KROM CELİK IND.A.C.
| City | : Gebze |
| Process | : Biological Treatment |
| Capacity | : 20 m3/day |
| Construction Year | : 1998 |
SAMSUN – CARSAMBA AIRPORT
| City | : Samsun |
| Process | : Biological Treatment |
| Capacity | : 400 m3/day |
| Construction Year | : 1998 |
DETA KEFKEN RESIDENCES
| City | : Kocaeli |
| Process | : Biological Treatment |
| Capacity | : 2×60 m3/day |
| Construction Year | : 1998 |
| City | : Ayvalik |
| Process | : Biological Treatment |
| Capacity | : 100 m3/day |
| Construction Year | : 1998 |
KNOOR – ORSAN IND.TRA..A.C.
| City | : Corlu |
| Process | : Recycle Type Demineralization System |
| Capacity | : 3 m3/h |
| Construction Year | : 1998 |
ULUSAN ALUMINIUM IND.TRA..A.C.
| City | : Konya |
| Process | : Recycle Type Demineralization System |
| Capacity | : 3 m3/h |
| Construction Year | : 1998 |
| Process | : Pre Treatment Unit + Reverse Osmosis System |
| Capacity | : 4 m3/h |
| Construction Year | : 1998 |
SASA SYNTHETIC FIBER IND.A.C.
| City | : Adana |
| Process | : Sand Filter and Softening System |
| Capacity | : 50 m3/h |
| Construction Year | : 1998 |
| Process | : Sand Filter and Softening System |
| Capacity | : 3×25 m3/h |
| Construction Year | : 1999 |
LVL – GREECE
| City | : Greece |
| Process | : Recycle Type Demineralization System |
| Capacity | : 3 m3/h |
| Construction Year | : 1998 |
ASSAN IRON IND. A.Ş
| City | : Istanbul |
| Process | : Industrial Treatment (Chemical Treatment) |
| Capacity | : 25 m3/day |
| Construction Year | : 1998 |
TRAKYA GLASS IND.A.C.
| City | : Corlu |
| Process | : Tandem Softening System |
| Capacity | : 40 m3/h |
| Construction Year | : 1998 |
ANADOLU ISUZU IND.TRA..A.C.
| City | : Gebze |
| Process | : Sand Filter+Tandem Activated Carbon Filter+ Tandem |
| Softening System | |
| Capacity | : 80 m3/h |
| Construction Year | : 1998 |
HES CABLE IND.A.C.
| City | : Kayseri |
| Process | : Biological Treatment |
| Capacity | : 2×40 m3/day |
| Construction Year | : 1998 |
TPIC
| City | : Kazakistan |
| Process | : Biological Treatment |
| Capacity | : 10 m3/day |
| Construction Year | : 1998 |
TURKEY CENTRAL BANK MARMARİS RECREATIONAL FACILITIES
| City | : Marmaris |
| Process | : Biological Treatment |
| Capacity | : 100 m3/day |
| Construction Year | : 1999 |
ARCELIK LG CLIMA FACTORY
| City | : Gebze |
| Process | : Tandem Demineralization System |
| Capacity | : 3 m3/h |
| Construction Year | : 1999 |
| Process | : Industrial Treatment (Chemical Treatment) |
| Capacity | : 10 m3/h |
| Construction Year | : 1999 |
GRAND HALİC HOTEL
| City | : Istanbul |
| Process | : Tandem Demineralization System |
| Capacity | : 3 m3/h |
| Construction Year | : 1999 |
KARADENIZ ARCHITECTURE
| City | : Canakkale |
| Process | : Biological Treatment |
| Capacity | : 10 m3/day |
| Construction Year | : 1999 |
SELCOM ASFEN ELEVATOR IND. AND TRA.LTD. STI.
| City | : Istanbul |
| Process | : Industrial Treatment (Chemical Treatment) |
| Capacity | : 5 m3/day |
| Construction Year | : 1999 |
| Process | : Recycle Type Demineralization System |
| Capacity | : 3 m3/h |
| Construction Year | : 2000 |
VESTEL IND.TRA..A.C.
| City | : Manisa |
| Process | : Recycle Type Demineralization System |
| Capacity | : 3 m3/h |
| Construction Year | : 1999 |
BSH PROFILO HOME GADGEDTS IND.TRA..A.C.
| City | : Çerkezköy |
| Process | : Pre Treatment Unit + Reverse Osmosis System |
| Capacity | : 4 m3/h |
| Construction Year | : 1999 |
TEKEL IZMIR TOBACCO FACTORY
| City | : Izmir |
| Process | : Sand Filter + Tandem Softening System |
| Capacity | : 42 m3/h |
| Construction Year | : 1999 |
| Process | : Pre Treatment Unit + Reverse Osmosis System |
| Capacity | : 6 m3/h |
| Construction Year | : 1999 |
| Process | : Biological Treatment |
| Capacity | : 3×100 m3/day |
| Construction Year | : 2000 |
KORUMA CHLOR-ALKALI IND.TRA..A.C.
| City | : İzmit |
| Process | : Pre Treatment Unit + Reverse Osmosis System |
| Capacity | : 15 m3/h |
| Construction Year | : 1999 |
TEKEL ANKARA WHISKY FACTORY
| City | : Ankara |
| Process | : Demineralization System |
| Capacity | : 5 m3/h |
| Construction Year | : 1999 |
| Process | : Pre Treatment Unit + Reverse Osmosis System |
| Capacity | : 6.3 m3/h |
| Construction Year | : 1999 |
| Process | : Tandem Sand Filter +Tandem Activated Carbon Filter |
| Capacity | : 42 m3/h |
| Construction Year | : 1999 |
| Process | : Tandem Softening System |
| Capacity | : 3×42 m3/h |
| Construction Year | : 1999 |
GENTEM INTERNATIONAL SHIPPING TRA.LTD.STI.
| City | : Silivri |
| Process | : Biological Treatment |
| Capacity | : 10 m3/day |
| Construction Year | : 1999 |
ERTEKNIK – MINISTRY OF DEFENSE
| City | : Erzurum |
| Process | : Seperator Filter and Full-Automatic Filter |
| Capacity | : 90 m3/h |
| Construction Year | : 1999 |
| Process | : Softening System |
| Capacity | : 16 m3/h |
| Construction Year | : 1999 |
MEY ALCOHOLIC BEVERAGES IND.TRA.A.C.BILECIK BEVERAGE FACTORY
| City | : Bilecik |
| Process | : Chloronation + Sand Filter |
| Capacity | : 50 m3/h |
| Construction Year | : 1999 |
| Process | : Tandem Sand Filter |
| Capacity | : 15 m3/h |
| Construction Year | : 2000 |
| Process | : Softening System |
| Capacity | : 3×30 m3/h |
| Construction Year | : 1999 |
| Process | : Pre-treatment Unit + Reverse Osmosis System |
| Capacity | : 6 m3/h |
| Construction Year | : 1999 |
ALARKO CARRIER IND.TRA..A.C.
| City | : Kocaeli |
| Process | : Biological Treatment |
| Capacity | : 80 m3/day |
| Construction Year | : 2000 |
| Process | : Industrial Treatment (Chemical Treatment) |
| Capacity | : 3 m3/h |
| Construction Year | : 2000 |
AKSOYLAR TOURISM IND.TRA..A.C.
| City | : Van |
| Process | : Biological Treatment |
| Capacity | : 80 m3/day |
| Construction Year | : 2000 |
MENZOLIT SYNTHETIC REZIN IND.TRA.A.C.
| City | : Aksaray |
| Process | : Industrial Treatment (Chemical Treatment) |
| Capacity | : 10 m3/day |
| Construction Year | : 2000 |
| Process | : Pre-treatment Unit + Reverse Osmosis System |
| Capacity | : 12 m3/h |
| Construction Year | : 2000 |
HEMA IND. A.C.
| City | : Tekirdag |
| Process | : Industrial Treatment (Chemical Treatment) |
| Capacity | : 4 m3/h |
| Construction Year | : 2000 |
PETROL OFISI GENERAL MANAGEMENT
| City | : Trabzon |
| Process | : Industrial Treatment (Chemical Treatment) |
| Capacity | : 5 m3/h |
| Construction Year | : 2000 |
İ.E.T.T. GENERAL MANAGEMENT
| City | : Ayazaga Garage – Istanbul |
| Process | : Industrial Treatment (Chemical Treatment) |
| Capacity | : 225 m3/day |
| Construction Year | : 2000 |
| City | : Hasanpasa Garage – Istanbul |
| Process | : Industrial Treatment (Chemical Treatment) |
| Capacity | : 72.5 m3/day |
| Construction Year | : 2001 |
ET ve BALIK KURUMU A.C.
| City | : Erzurum |
| Process | : Industrial Treatment (Chemical Treatment) |
| Capacity | : 75 m3/h |
| Construction Year | : 2000 |
| City | : Sakarya |
| Process | : Industrial Treatment (Chemical Treatment) |
| Capacity | : 40 m3/h |
| Construction Year | : 2000 |
| City | : Kayseri |
| Process | : Industrial Treatment (Chemical Treatment) |
| Capacity | : 40 m3/h |
| Construction Year | : 2000 |
| City | : Adana |
| Process | : Industrial Treatment (Chemical Treatment) |
| Capacity | : 40 m3/h |
| Construction Year | : 2000 |
STROYTRANTSGAZ
| City | : Russia |
| Process | : Recycle Type Demineralization System |
| Capacity | : 3 m3/h |
| Construction Year | : 2000 |
ROBERT BOSCH
| City | : Bursa |
| Process | : Recycle Type Demineralization System |
| Capacity | : 10 m3/h |
| Construction Year | : 2000 |
SUZER CENTER
| City | : Istanbul |
| Process | : Tandem Sand Filter |
| Capacity | : 65 m3/h |
| Construction Year | : 2000 |
| Process | : Triplex Softening System |
| Capacity | : 21 m3/h |
| Construction Year | : 2000 |
| Process | : Tandem Softening System |
| Capacity | : 17 m3/h |
| Construction Year | : 2000 |
| Process | : Disinfection Systems |
| Capacity | : 17 m3/h |
| Construction Year | : 2000 |
GUNERCA CHEMICALS IND. TRA. A.C.
| City | : Çorlu |
| Process | : Demineralization System |
| Capacity | : 6 m3/h |
| Construction Year | : 2000 |
TEKEL TARSUS SUMALIK WINE FACTORY
| City | : Tarsus |
| Process | : Tandem Sand Filter |
| Capacity | : 30 m3/h |
| Construction Year | : 2000 |
| Process | : Tandem Softening System |
| Capacity | : 15 m3/h |
| Construction Year | : 2000 |
| Process | : Disinfection Systems |
| Capacity | : 15 m3/h |
| Construction Year | : 2000 |
| Process | : Drinking Water Treatment System |
| Capacity | : 15 m3/h |
| Construction Year | : 2000 |
MINISTRY OF DEFENCE ARMY MEDICINE FACTORY
| City | : Ankara |
| Process | : Sand Filter |
| Capacity | : 5 m3/h |
| Construction Year | : 2000 |
| Process | : Activated Carbon Filter |
| Capacity | : 3 m3/h |
| Construction Year | : 2000 |
| Process | : Tandem Softening System |
| Capacity | : 3 m3/h |
| Construction Year | : 2000 |
| Process | : Pre-treatment Unit + Reverse Osmosis System |
| Capacity | : 1.1 m3/h |
| Construction Year | : 2000 |
| Process | : U.V.Systems +Submicron Feed and |
| Conduction System | |
| Capacity | : 2 m3/h |
| Construction Year | : 2000 |
TURKEY SUGAR FACTORY A.C. KIRSEHIR SUGAR FACTORY
| City | : Kırşehir |
| Process | : Pre-Treatment Unit+Dosage Unit+Tandem Sand Filter+ |
| Tandem Activated Carbon Filter | |
| Capacity | : 30 m3/h |
| Construction Year | : 2000 |
| Process | : Steam Boiler Feeding Systems and Reverse Osmosis Systems |
| Capacity | : 15 m3/h |
| Construction Year | : 2000 |
| Process | : Drinking and Tap Water Reverse Osmosis System |
| Capacity | : 15 m3/h |
| Construction Year | : 2000 |
| Process | : Conduction and Boiler Dosage Systems |
| Capacity | : 5 m3/h |
| Construction Year | : 2000 |
DOGUS CHEMICALS A.C.
| City | : Istanbul |
| Process | : Sand Filter+Softening System |
| Capacity | : 3 m3/h |
| Construction Year | : 2000 |
MODERN ENERGY ELECTRICAL PROD.AND OTOPRODUCTION GROUP A.C.
| City | : Corlu |
| Process | : Pre-Treatment Unit+Dosage Unit +Tandem Sand Filter+ |
| Activated Carbon Filter | |
| Capacity | : 36 m3/h |
| Construction Year | : 2000 |
| Process | : Two-Step Reverse Osmosis System |
| Capacity | : 25 m3/h |
| Construction Year | : 2000 |
| Process | : Tandem Mix-bed System |
| Capacity | : 60 m3/h |
| Construction Year | : 2000 |
| Process | : MultilaCity Filtrasyon System |
| Capacity | : 3×50 m3/h |
| Construction Year | : 2000 |
| Process | : Boiler Feeding Water Preparation System |
| (Pre-Treatment Unit +Reverse Osmosis System) | |
| Capacity | : 45 m3/h |
| Construction Year | : 2001 |
| Process | : Condenser Recyle Treatment System |
| (Tandem MultilaCity Filtre System) | |
| Capacity | : 50 m3/h |
| Construction Year | : 2002 |
| Process | : Condenser Recyle Treatment System |
| (Tandem Mix-bed System) | |
| Capacity | : 40 m3/h |
| Construction Year | : 2002 |
TURKEY BOTTLE AND GLASS FACTORY A.C. GLASS FIBER IND.A.C.
| City | : Gebze |
| Process | : Demineralization System + Reverse Osmosis System |
| Capacity | : 7 m3/h |
| Construction Year | : 2000 |
ELBA PRESS FOUNDRY IND.TRA..A.C.
| City | : Manisa |
| Process | : Recycle Type Demineralization System |
| Capacity | : 3 m3/h |
| Construction Year | : 2001 |
MAN B&W DIESEL AG – BIRLIK ENERGY ELEC.PROD.OTOP.GROUP
| City | : Denizli |
| Process | : Denizli Organize Sanayi Bölgesi Boiler Feeding and Cooling |
| Water Preparation System | |
| (Pre-Treatment Unit +Reverse Osmosis System+Softening System) | |
| Capacity | : 33 m3/h |
| Construction Year | : 2001 |
EAST MEDİTERRANEAN UNIVERSITY
| City | : Cyprus |
| Process | : Drinking Water Preparing From Sea Water |
| (Pre-Treatment Unit +Reverse Osmosis System+Energy Recovery System+Advanced Treatment) | |
| Capacity | : 1000 m3/h |
| Construction Year | : 2001 |
BARMEK GAMA PARTNERSHIP
| City | : Kirikale |
| Process | : Biological Treatment |
| Capacity | : 20 m3/day |
| Construction Year | : 2001 |
CARREFOUR – SA MALL
| City | : Hadımkoy |
| Process | : Biological Treatment |
| Capacity | : 150 m3/day |
| Construction Year | : 2001 |
KESAN MUNUCIPALITY SLAUGHTERHOUSE
| City | : Kesan |
| Process | : Industrial Treatment (Chemical Treatment) |
| Capacity | : 100 m3/day |
| Construction Year | : 2001 |
SARAY FOUNDRY IND. A.C.
| City | : Istanbul |
| Process | : Industrial Treatment (Chemical Treatment) |
| Capacity | : 5 m3/h |
| Construction Year | : 2001 |
| Process | : Pre-filtration Recycle Type Demineralization System |
| Capacity | : 1.5 m3/h |
| Construction Year | : 2003 |
| Process | : Recycle Type Demineralization System |
| Capacity | : 7 m3/h |
| Construction Year | : 2004 |
| City | : Çerkezkoy |
| Process | : Industrial Treatment (Chemical Treatment) |
| Capacity | : 500 m3/h |
| Construction Year | : 2004 |
| Process | : Recycle Type Demineralization System |
| Capacity | : 4 m3/h |
| Construction Year | : 2005 |
| Process | : Tandem Softening System |
| Capacity | : 25 m3/h |
| Construction Year | : 2005 |
TEKSTURE SOCKS IND. TRA.. A.C.
| City | : Istanbul |
| Process | : Industrial Treatment (Chemical + Biological Treatment) |
| Capacity | : 130 m3/day |
| Construction Year | : 2001 |
KENMORE REFRIGRATION
| City | : Gebze |
| Process | : Pre-treatment Recycle Type Demineralization System |
| Capacity | : 1 m3/h |
| Construction Year | : 2001 |
HOBI SOCKS TEXTILE IND.TRA..A.C.
| City | : Istanbul |
| Process | : Drinking and Potable Water System |
| (Pre-treatment Unit+Reverse Osmosis System+Advanced Treatment ) | |
| Capacity | : 29 m3/h |
| Construction Year | : 2001 |
ALIMEX ALUMINIUM IND.TRA..A.C.
| City | : Akyazi |
| Process | : Recycle Type Demineralization System |
| Capacity | : 3 m3/h |
| Construction Year | : 2002 |
CAN TEXTILE IND.TRA..A.C.
| City | : Corlu |
| Process | : Boiler Feeding Water Preparation System |
| (Reverse Osmosis System) | |
| Capacity | : 6 m3/h |
| Construction Year | : 2002 |
TUP MERCERIZED TEXTILE IND.A.C.
| City | : Luleburgaz |
| Process | : Process Water Treatment System |
| (Pre-Treated Decationization System) | |
| Capacity | : 250 m3/h |
| Construction Year | : 2002 |
DS SMITH PLC TURKEY COPIKAS PAPERMILL AND BOXES IND.A.C.
| City | : Corum |
| Process | : Boiler Feeding Water Preparation System |
| (Pre-filtration Unit+Reverse Osmosis Syst.+Softening Syst.) | |
| Capacity | : 4 m3/h |
| Construction Year | : 2002 |
ERKU INTERNATIONAL CONSTRUCTION SERVICES LTD. STI.
| City | : Turkmenistan |
| Process | : Industrial Treatment (Biological Treatment) |
| Capacity | : 3600 m3/day |
| Construction Year | : 2002 |
S.S.BODRUM AYYILDIZ KENT AND S.S. YENI SILA BUILDING SOCIETY
| City | : Bodrum |
| Process | : Biological Treatment |
| Capacity | : 110 m3/day |
| Construction Year | : 2002 |
S.S.GOZDEKENT HOLIDAY VILLAGES VE BUILDING SOCIETY
| City | : Mugla / Milas |
| Process | : Biological Treatment |
| Capacity | : 100 m3/day |
| Construction Year | : 2002 |
URAL OZCAN ARCHITECTURE AND ENGINEERING LTD. STI.
| City | : Saray |
| Process | : Biological Treatment |
| Capacity | : 30 m3/day |
| Construction Year | : 2002 |
VAN MANAGEMENT OF EDUCATION
| City | : Van |
| Process | : Biological Treatment |
| Capacity | : 120 m3/day |
| Construction Year | : 2002 |
ISTANBUL RURAL SERVICES GENERAL MANAGEMENT CATALCA IZZETTIN VILLAGE
| City | : Istanbul |
| Process | : Biological Treatment |
| Capacity | : 233.1 m3/day |
| Construction Year | : 2002 |
GURPINAR BOARDING SCHOOL
| City | : Van |
| Process | : Biological Treatment |
| Capacity | : 80 m3/day |
| Construction Year | : 2002 |
TURKEY SUGAR FACTORY A.C.ERZURUM SUGAR FACTORY
| City | : Erzurum |
| Process | : Boiler Feeding Water Preparation System |
| (Pre-Treatment System +Dosage Unit+Tandem Sand Filter+ Tandem Activated Carbon Filter+Reverse Osmosis System) | |
| Capacity | : 15 m3/h |
| Construction Year | : 2002 |
TURKEY SUGAR FACTORY A.C.MALATYA SUGAR FACTORY
| City | : Malatya |
| Process | : Boiler Feeding Water Preparation System |
| (Pre-Treatment System +Dosage Unit+Tandem Sand Filter+ Tandem Activated Carbon Filter+Reverse Osmosis System) | |
| Capacity | : 15 m3/h |
| Construction Year | : 2002 |
BOTERSAN – ROZMAS CHUO AUTOMOTIVE IND.A.C.
| City | : Gebze |
| Process | : Recycle Type Demineralization System |
| Capacity | : 3 m3/h |
| Construction Year | : 2003 |
EVPA MARKETING
| City | : Istanbul |
| Process | : Enpenye Bath Preparation System |
| (Pre-Treatment+Reverse Osmosis System) | |
| Capacity | : 20 m3/h |
| Construction Year | : 2003 |
ICDAS STEEL ENERGY DOCKS AND SHIPPING A.C.
| City | : Canakkale |
| Process | : Cooling Water Preparation System |
| (Pre-Treatment+Reverse Osmosis System) | |
| Capacity | : 1000 m3/h |
| Construction Year | : 2003 |
DOGUS TURGUTREIS MARINA MANAGEMENT AND TOURISM TRA..A.C.
| City | : Bodrum |
| Process | : Biological Treatment |
| Capacity | : 240 m3/day |
| Construction Year | : 2003 |
EKIN PROJECT
| City | : Istanbul |
| Process | : Biological Treatment |
| Capacity | : 10 m3/day |
| Construction Year | : 2003 |
MIDAS GIFTWARE IND.TRA. A.C.
| City | : Istanbul |
| Process | : Industrial Treatment (Chemical Treatment) |
| Capacity | : 2 m3/h |
| Construction Year | : 2003 |
PLANTAFARMA MEDICINE IND. AND TRA. A.C.
| City | : Duzce |
| Process | : Industrial Treatment (Chemical Treatment) |
| Capacity | : 80 m3/day |
| Construction Year | : 2003 |
PASABAHCE GLASS IND. AND TRA.A.C.
| City | : Russia |
| Process | : Chrome Removal Plant |
| Capacity | : 0.2 m3/h |
| Construction Year | : 2003 |
BURSEL TEXTILE IND. IMP AND EXP.A.C.
| City | : Turkmenistan |
| Process | : Industrial Treatment (Nitralizasyon System) |
| Capacity | : 200 m3/h |
| Construction Year | : 2003 |
FAVORI JEWELLERY IND. TRA. LTD. STI.
| City | : Istanbul |
| Process | : Industrial Treatment (Chemical Treatment) |
| Capacity | : 1 m3/h |
| Construction Year | : 2003 |
SABANCI DUPONT INDUSTRIAL YARN AND FIBER IND.TRA..A.C.
| City | : Izmit |
| Process | : Cooling and Process Water Preparation System |
| (Pre-treatment+Reverse Osmosis System+Degasser+ | |
| ph Adjustment System) | |
| Capacity | : 2×25 m3/h |
| Construction Year | : 2003 |
SANICA RADIATOR PANEL IND.TRA.A.C.
| City | : Istanbul |
| Process | : Recycle Type Demineralization System |
| Capacity | : 2.5 m3/h |
| Construction Year | : 2003 |
POLITEKNIK METAL IND.A.C.
| City | : Suriye |
| Process | : Pre-Treatment+Tandem Demineralization System |
| Capacity | : 1.5 m3/h |
| Construction Year | : 2003 |
ICDAS STEEL ENERGY DOCKS AND SHIPPING A.C.
| City | : Canakkale |
| Process | : Biological Treatment |
| Capacity | : 142 m3/day |
| Construction Year | : 2003 |
| Capacity | : 10 m3/day |
| Construction Year | : 2003 |
| Capacity | : 48 m3/day |
| Construction Year | : 2003 |
| Capacity | : 40 m3/day |
| Construction Year | : 2003 |
| Capacity | : 188 m3/day |
| Construction Year | : 2003 |
S.S.ACAR RESIDENTAL BUILDING SOCIETY
| City | : Ankara |
| Process | : Biological Treatment |
| Capacity | : 60 m3/day |
| Construction Year | : 2004 |
BURSEL TEXTILE IND. IMP AND EXP. A.C.
| City | : Ozbekistan |
| Process | : Textile Industry Process Water Preparation System |
| Capacity | : 200 m3/h |
| Construction Year | : 2003 |
KURTOGLU LEAD-COPPER IND.A.C.
| City | : Corlu |
| Process | : Recycle Type Demineralization System |
| Capacity | : 7 m3/h |
| Construction Year | : 2004 |
| Process | : Recycle Type Demineralization System |
| Capacity | : 3 m3/h |
| Construction Year | : 2004 |
| Process | : One-Step Softening System |
| Capacity | : 10 m3/h |
| Construction Year | : 2004 |
| Process | : Industrial Treatment (Chemical Treatment) |
| Capacity | : 13 m3/h |
| Construction Year | : 2004 |
BOYTEKS DYE-TEXTILE IND.A.C.
| City | : Corlu |
| Process | : Dyebath Preparation System |
| (Pre-treatment+Reverse Osmosis System) | |
| Capacity | : 42 m3/h ( 1000 m3/day) |
| Construction Year | : 2004 |
ATAER ENERGY OTOPRODUCTION IND.TRA..A.C.
| City | : Izmir |
| Process | : Advanced Deiyonization System+Mix-bed System |
| Capacity | : 24 m3/h ( 1000 m3/day) |
| Construction Year | : 2004 |
UNİTED LEATHER IND.TRA..LTD.STI.
| City | : Izmir |
| Process | : Process Water Preparation System |
| (Pre-treatment+Reverse Osmosis System) | |
| Capacity | : 10.4 m3/h ( 250 m3/day) |
| Construction Year | : 2004 |
DAMAT PAINT AND METAL WORKS PRO.MAR.A.C.
| City | : Manisa |
| Process | : Recycle Type Demineralization System |
| Capacity | : 3 m3/h |
| Construction Year | : 2004 |
ROZMAC CHUO AUTOMOTIVE IND. A.C.
| City | : Istanbul |
| Process | : Industrial Treatment (Chemical + Biological Treatment) |
| Capacity | : 15 m3/h |
| Construction Year | : 2004 |
GREEN PARK OTEL
| City | : Izmit |
| Process | : Biological Treatment |
| Capacity | : 200 m3/day |
| Construction Year | : 2004 |
GAMMA-PAK STERILIZATION IND.TRA..A.C.
| City | : Çerkezkoy |
| Process | : Demineralization System |
| Capacity | : 2 m3/h |
| Construction Year | : 2004 |
LIGNA DÉCOR IND.TRA.A.C.
| City | : Istanbul |
| Process | : Enpenye Plant Bath Water Preparation System |
| (Reverse Osmosis System) | |
| Capacity | : 20 m3/day |
| Construction Year | : 2004 |
TUPRAS IZMIT REFINERY
| City | : Izmit |
| Process | : Demineralization Unit and System Integration |
| Capacity | : 150 m3/h |
| Construction Year | : 2005 |
ELBA PRESSURE CASTING IND.A.C.
| City | : Izmir |
| Process | : Recycle Type Demineralization System |
| Capacity | : 4 m3/h |
| Construction Year | : 2005 |
TURKEY SUGAR FACTORY A.C. AFYON SUGAR FACTORY
| City | : Afyon |
| Process | : Steam Boiler Feeding Water Preparation System |
| Pre-treatment+Reverse Osmosis System) | |
| Capacity | : 15 m3/h |
| Construction Year | : 2005 |
TURKEY SUGAR FACTORY A.C. AGRI SUGAR FACTORY
| City | : Ağrı |
| Process | : Steam Boiler Feeding Water Preparation System |
| (Pre-treatment+Reverse Osmosis System) | |
| Capacity | : 10 m3/h |
| Construction Year | : 2005 |
KUYUMCUKENT S.S. ISTANBUL JEWELLERY CRAFTMANSHIP BUILDING SOCIETY
| City | : Istanbul |
| Process | : Industrial Treatment (Chemical Treatment) |
| Capacity | : 15 m3/day |
| Construction Year | : 2005 |
LISI AEROSPACE A.C.
| City | : Izmir |
| Process | : Industrial Waste Water Treatment System |
| Capacity | : 30 m3/day |
| Construction Year | : 2005 |
SISECAM BULGARIA
| Place | : Bulgaria |
| Process | : Industial Treatment System (Chemical Treatment) |
| Capacity | : 15 m3/day |
| Construction Year | : 2005 |
TRAKYA GLASS BULGARIA EAD GLASS PROCESSING LINE
| City | : Bulgaristan |
| Process | : Industrial Treatment (Chemical Treatment) |
| Capacity | : 15 m3/h |
| Construction Year | : 2005 |
| Process | : Chemical Treatment System+Sand Filter |
| Capacity | : 150 m3/day |
| Construction Year | : 2006 |
| Process | : Chemical Waste Water System+Biological Waste Water |
| System + Sand Filter | |
| Capacity | : 200 m3/day |
| Construction Year | : 2006 |
KONYA SUGAR IND.TRA.A.C. CUMRA SUGAR FACTORY
| City | : Konya |
| Process | : Recycle Type Demineralization System |
| Capacity | : 75 m3/h |
| Construction Year | : 2006 |
| Process | : Pre-filtration+Dosage Unit+Tandem Sand Filter+Tandem |
| Activated Carbon Filter+Steam Boiler Feeding Water Preparation System+ Reverse Osmosis System | |
| Capacity | : 21 m3/h |
| Construction Year | : 2003 |
| Process | : Steam Boiler Feeding Water Preparation System |
| (Pre-treatment +Reverse Osmosis System) | |
| Capacity | : 200 m3/day |
| Construction Year | : 2006 |
JANTSA RIM IND.TRA.A.C.
| City | : Aydın |
| Process | : Recycle Type Demineralization System |
| Capacity | : 3 m3/h |
| Construction Year | : 2006 |
JANTSA TITAN RIM IND.TRA..A.C.
| City | : Aydın |
| Process | : Recycle Type Demineralization System |
| Capacity | : 1.5 m3/h |
| Construction Year | : 2006 |
UCLER ALUMINIUM ELECTROSTATIC PAINT IND.TRA.LTD.STI.
| City | : Istanbul |
| Process | : Recycle Type Demineralization System |
| Capacity | : 3 m3/h |
| Construction Year | : 2006 |
POLATLI MUNICIPALITY
| City | : Ankara / Polatlı |
| Process | : Drinking and Portable Water Preparation System |
| (Nanofiltration System) | |
| Capacity | : 30.000 m3/day |
| Construction Year | : 2006 |
BARTIN MUNICIPALITY
| City | : Bartin |
| Process | : Turbe |
| (Dosage Unit+Sand Filters+Drinking and Tap Water | |
| Treatment System) | |
| Capacity | : 720 m3/h |
| Construction Year | : 2006 |
| Process | : Karakoy |
| (Dosage Unit+Sand Filters+Drinking and Tap Water | |
| Treatment System) | |
| Capacity | : 324 m3/h |
| Construction Year | : 2006 |
| Process | : Ordu |
| (Dosage Unit+Sand Filters+Drinking and Tap Water | |
| Treatment System) | |
| Capacity | : 324 m3/h |
| Construction Year | : 2006 |
DEMISAS STAINLESS GLOSS IND.A.C.
| City | : Bilecik |
| Process | : Wastewater Reclamation and Reuse System |
| (Sand+Activated Carbon Filter) | |
| Capacity | : 10 m3/h |
| Construction Year | : 2006 |
DEGIRMENCI CONSTRUCTION AND TOURISM A.C.
| City | : Bodrum |
| Process | : Biological Wastewater Treatment Plant |
| Capacity | : 25 m3/day |
| Construction Year | : 2006 |
ERBAA MUNICIPALITY
| City | : Erbaa /Tokat |
| Process | : Advanced Biological Treatment System Nitrification + |
| Denitrification+Phosphorus Removal | |
| Capacity | : 21000 m3/day |
| Construction Year | : 2006 |
OYAK RENAULT
| Place | : Bursa |
| Process | : Demineralisation System |
| Capacity | : 1440 m3/day |
| Construction Year | : 2007 |
YUNUS TEXTILE
| Place | : Pakistan |
| Process | : Industrial Waste Water System |
| Capacity | : 2728 m3/day |
| Construction Year | : 2007 |
BOLU (CENTER) WASTEWATER TREATMENT SYSTEM AND COLLECTOR LINE CONSTRUCTION WORK
| Place | : Bolu |
| Process | : Municipality Waste Water Biological Treatment System |
| Capacity | : 29000 m3/day |
| Construction Year | : 2007 |
BALOCHISTAN, GAWADAR SEA WATER TREATMENT SYSTEM
| Place | : Pakistan |
| Process | : Drinking And Portable Water Preparing System From Sea Water (Sea Water Taking Construction + Pre-Treatment + Reverse Osmosis System+ Energy Recovery System) |
| Capacity | : 4.000 m3/day |
| Construction Year | : 2006 |
BOSAL MIMAYSAN A.C.
| Place | : Istanbul |
| Process | : Industrial Waste Water Treatment System |
| Capacity | : 70 m3/day |
| Construction Year | : 2007 |
| Process | : Industrial Waste Water Treatment System |
| Capacity | : 60 m3/day |
| Construction Year | : 2007 |
| Process | : Recycle Type Demineralization System |
| Capacity | : 70 m3/day |
| Construction Year | : 2007 |
| Process | : Softening System |
| Capacity | : 70 m3/day |
| Construction Year | : 2007 |
FERROLI HEATING AND CLIMATE SYİSTEMS IND. TRA. VE SERVICE A.C.
| Place | : Duzce |
| Process | : Industrial Wastewater Treatment System |
| Capacity | : 288 m3/day |
| Construction Year | : 2007 |
| Process | : Recycle Type Demineralization System |
| Capacity | : 120 m3/day |
| Construction Year | : 2007 |
| Process | : Softening System |
| Capacity | : 72 m3/day |
| Construction Year | : 2007 |
KONYA COURT HOUSE
| Place | : Konya |
| Process | : Tandem Water Softening System |
| Capacity | : 24 m3/day |
| Construction Year | : 2007 |
AL-DIWANIYAH
| Place | : Irak |
| Process | : Waste Water Treatment System |
| Capacity | : 22.000 m3/day |
| Construction Year | : 2007 |
PASABAHCE ESKISEHIR CAM IND. VE TRA. A.C.
| Place | : Eskişehir |
| Process | : Water Softening System |
| Capacity | : 480 m3/day |
| Construction Year | : 2007 |
KONYA CUMRA SEKER (HAZ ENGINEERING)
| Place | : Konya |
| Process | : Boiler Feeding Water Preparation System |
| (Reverse Osmosis System) | |
| Capacity | : 192 m3/day |
| Construction Year | : 2007 |
GAZI MAGOSA-DAU SEA WATER DESALINATION PLANTS BUILT-OPERATE-TRANSFERS FOR 15 YEARS
| Place | : Cyprus |
| Process | : Drinking And Portable Water Preparing System From Sea Water |
| (Sea Water Intake Construction + Pre-Treatment+Reverse Osmosis System+ Energy Recovery System) | |
| Capacity | : 4000 m3/day |
| Construction Year | : 2008 |
İZMİR MUNICIPALITY
| Place | : İzmir ( Menemen Acil ve Halkapınar) |
| Process | : Arsenic Removal System |
| Capacity | : 86.400 m3/day + 51.840 m3/day |
| Construction Year | : 2008 |
ISKI / ŞILE – KERVANSARAY - BIÇKIDERE DRINKING WATER TREATMENT SYSTEM
| Place | : Şile / Bıçkıdere |
| Process | : Water Treatment Plant (Filtration System) |
| Capacity | : 4320 m3/day |
| Construction Year | : 2008 |
KÖPRÜLÜ DIŞ TİCARET LTD. ŞTİ.
| Place | : Irak |
| Process | : Reverse Osmosis System |
| Capacity | : 3 m3/hr |
| Construction Year | : 2008 |
TEKNİK MAKİNE OTOMOTİV TEKSTİL İNŞAAT SANAYİ VE TİCARET A.Ş.
| Place | : Kartal / İSTANBUL |
| Process | : Industrial Wastewater Treatment System |
| Capacity | : 7 m3/batch |
| Process | : Recycle Type Demineralization System |
| Capacity | : 5 m3/hr |
| Construction Year | : 2010 |
KARACHI PORT
| Place | : Karachi / PAKISTAN |
| Process | : Drinking And Portable Water Preparing System From Sea Water |
| Capacity | : 2 x 454 m3/day |
| Construction Year | : 2010 |
AROMSA BESİN AROMA VE KATKI MADDELERİ SANAYİ VE TİCARET A.Ş.
| Place | : Gebze/KOCAELİ |
| Process | : Chemical and Biological Waste Water Treatment |
| Capacity | : 360 m3/day |
| Construction Year | : 2010 |
VİSÖR MÜHENDİSLİK İNŞAAT TURİZM GIDA ve MEKANİK ELEKTRİK TAAH. Tic. Ltd. Şti.
| Place | : Bereket/TÜRKMENİSTAN |
| Process | : Drinking And Portable Water Preparing System |
| (Ultrafiltration + Reverse Osmosis ) | |
| Capacity | : 20.000 m3/day |
| Construction Year | : 2010 |
KUYUMCUKENT S.S. İSTANBUL KUYUMCU SANATKARLARI TOPLU İŞYERİ YAPI KOOPERATİFİ
| Place | : ISTANBUL |
| Process | : Chemical Treatment (increase capacity) |
| Capacity | : 10 m3/hr |
| Construction Year | : 2010 |
KOTRI INDUSTRIAL ZONE
| Place | : Pakistan |
| Process | : Industrial Waste Water Treatmant Plant (Chemical + Biological) |
| Capacity | : 10.000 m3/gün |
| Construction Year | : 2010 |
NARMAN – VAN ARSENIC REMOVAL SYSTEM
| Place | : Narman / VAN |
| Proses | : Arsenic Removal System |
| Capacity | : 1440 m3/hr |
| Construction Year | : 2011 |
BEYÜZÜM – VAN PAKET ARSENIC REMOVAL SYSTEM
| Place | : Beyüzüm / VAN |
| Proses | : Arsenic Removal System |
| Capacity | : 270 m3/saat |
| Construction Year | : 2011 |