top of page

BURDUR WATER TREATMENT PLANT - DSI 18th REGIONAL DIRECTORATE

PLACE           : BURDUR / TURKEY

PROCESS      : WATER TREATMENT PLANT

CAPACITY     : 35.000 M3/DAY

YEAR             : 2019

BUSKI / KESTEL DRINKING AND POTABLE WATER TREATMENT PLANT CONSTRUCTION WORKS

PLACE           : BURSA / TURKEY

PROCESS      : DRINKING AND POTABLE WATER PREPARING SYSTEM

CAPACITY     : 10.368 M3/DAY

YEAR             : 2016

YUBBA DRINKING AND POTABLE WATER TREATMENT PLANT CONSTRUCTION WORKS

PLACE           : SAUDI ARABIA

PROCESS      : DRINKING AND POTABLE WATER PREPARING SYSTEM

CAPACITY     : 18.000 M3/DAY

YEAR             : 2016

QANUNA DRINKING AND POTABLE WATER TREATMENT PLANT CONSTRUCTION WORKS

PLACE           : SAUDI ARABIA

PROCESS      : DRINKING AND POTABLE WATER PREPARING SYSTEM

CAPACITY     : 18.000 M3/DAY

YEAR             : 2016

BABADAYHAN TURKMENISTAN  DRINKING AND POTABLE WATER TREATMENT PLANT CONSTRUCTION WORKS

PLACE           : BABADAYHAN/TÜRKMENISTAN

PROCESS      : DRINKING AND PORTABLE WATER PREPARING SYSTEM

                        (ULTRAFILTRATION + REVERSE OSMOSIS )

CAPACITY     : 30.000 M3/DAY

YEAR             : 2013

NARMAN – VAN ARSENIC REMOVAL SYSTEM

PLACE          : NARMAN / VAN

PROSES       : ARSENIC REMOVAL SYSTEM

CAPACITY   : 1440 M3/HR

YEAR           : 2011

BEYÜZÜM – VAN PAKET ARSENIC REMOVAL SYSTEM

PLACE          : BEYÜZÜM / VAN

PROSES       : ARSENIC REMOVAL SYSTEM

CAPACITY   : 270 M3/H

YEAR           : 2011

VISOR ENGINEERING CONSTRUCTION TOURISM FOOD and MECHANICAL ELECTRICITY CONTRACTING.  TIC. LTD. ŞTI.

PLACE           : BEREKET/TÜRKMENISTAN

PROCESS      : DRINKING AND POTABLE WATER PREPARING SYSTEM

                        (ULTRAFILTRATION + REVERSE OSMOSIS )

CAPACITY     : 20.000 M3/DAY

YEAR             : 2010

TEKNIK MAKINE AUTOMOTIVE TEXTILE CONSTRUCTION INDUSTRY AND TRADE INC.

IZMIR MUNICIPALITY

PLACE           : IZMIR ( MENEMEN ACIL VE HALKAPINAR)

PROCESS      : ARSENIC REMOVAL SYSTEM

CAPACITY     : 86.400 M3/DAY + 51.840 M3/DAY

YEAR             : 2008

 

ISKI / ŞILE – KERVANSARAY - BIÇKIDERE DRINKING WATER TREATMENT SYSTEM

PLACE           : ŞILE / BIÇKIDERE

PROCESS      : WATER TREATMENT PLANT (FILTRATION SYSTEM)

CAPACITY     : 4320 M3/DAY

YEAR             : 2008

KONYA CUMRA SEKER (HAZ ENGINEERING)

KONYA COURT HOUSE

FERROLI HEATING AND CLIMATE SYISTEMS IND. TRA. VE SERVICE A.C.

PLACE           : DUZCE

PROCESS      : INDUSTRIAL WASTEWATER TREATMENT SYSTEM

CAPACITY     : 288 M3/DAY

YEAR             : 2007

PROCESS      : RECYCLE TYPE DEMINERALIZATION SYSTEM

CAPACITY     : 120 M3/DAY

YEAR             : 2007

PROCESS      : SOFTENING SYSTEM

CAPACITY     : 72 M3/DAY

YEAR             : 2007

BOSAL MIMAYSAN A.C.

PLACE           : ISTANBUL

PROCESS      : INDUSTRIAL WASTE WATER TREATMENT SYSTEM

CAPACITY     : 70 M3/DAY

YEAR             : 2007

PROCESS      : DOMSTIC  WASTE WATER TREATMENT SYSTEM

CAPACITY     : 60 M3/DAY

YEAR             : 2007

PROCESS      : RECYCLE TYPE DEMINERALIZATION SYSTEM

CAPACITY     : 70 M3/DAY

YEAR             : 2007

PROCESS      : SOFTENING SYSTEM

CAPACITY     : 70 M3/DAY

YEAR             : 2007

BOLU (CENTER) WASTEWATER TREATMENT SYSTEM AND COLLECTOR LINE CONSTRUCTION WORK

PLACE           : BOLU

PROCESS      : MUNICIPALITY WASTE WATER BIOLOGICAL TREATMENT SYSTEM

CAPACITY     : 29000 M3/DAY

YEAR             : 2007

YUNUS TEXTILE

PLACE           : PAKISTAN

PROCESS      : INDUSTRIAL WASTE WATER SYSTEM

CAPACITY     : 2728 M3/DAY

YEAR             : 2007

OYAK RENAULT

PLACE           : BURSA

PROCESS      : DEMINERALISATION SYSTEM

CAPACITY     : 1440 M3/DAY

YEAR             : 2007

DEMISAS STAINLESS GLOSS IND.A.C.

BARTIN MUNICIPALITY

CITY               : BARTIN

PROCESS      : TURBE (DOSAGE UNIT+SAND FILTERS+DRINKING AND TAP 

                        WATER TREATMENT SYSTEM)

CAPACITY     : 720 M3/H

YEAR             : 2006

PROCESS      : KARAKOY (DOSAGE UNIT+SAND FILTERS+DRINKING AND TAP WATER  

                        TREATMENT SYSTEM)

CAPACITY     : 324 M3/H

YEAR             : 2006

PROCESS      : ORDU (DOSAGE UNIT+SAND FILTERS+DRINKING AND TAP

                         WATER TREATMENT SYSTEM)

CAPACITY     : 324 M3/H

YEAR             : 2006

POLATLI MUNICIPALITY

CITY               : ANKARA / POLATLI

PROCESS      : DRINKING AND POTABLE WATER PREPARATION SYSTEM                                                  NANOFILTRATION SYSTEM)

CAPACITY     : 30.000 M3/DAY

YEAR             : 2006

JANTSA RIM IND.TRA.A.C.

           

JANTSA TITAN RIM IND.TRA..A.C.

           

UCLER ALUMINIUM ELECTROSTATIC PAINT IND.TRA.LTD.STI.

KONYA SUGAR IND.TRA.A.C. CUMRA SUGAR FACTORY

CITY               : KONYA

PROCESS      : RECYCLE TYPE DEMINERALIZATION SYSTEM

CAPACITY     : 75 M3/H

YEAR             : 2006

PROCESS      : PRE-FILTRATION+DOSAGE UNIT+TANDEM SAND FILTER+TANDEM 

                        ACTIVATED CARBON FILTER+STEAM  BOILER FEEDING WATER

                        PREPARATION SYSTEM+REVERSE OSMOSIS SYSTEM

CAPACITY     : 21 M3/H

YEAR             : 2003

PROCESS      : STEAM BOILER FEEDING WATER PREPARATION SYSTEM (PRE-

                         TREATMENT +REVERSE OSMOSIS SYSTEM)

CAPACITY     : 200 M3/DAY

YEAR             : 2006

TURKEY SUGAR FACTORY  A.C. AFYON  SUGAR FACTORY

CITY               : AFYON

PROCESS      : STEAM BOILER FEEDING WATER PREPARATION SYSTEM

                        PRE-TREATMENT+REVERSE OSMOSIS SYSTEM)

CAPACITY     : 15 M3/H

YEAR             : 2005

           

TURKEY SUGAR FACTORY  A.C. AGRI  SUGAR FACTORY

CITY              : AĞRI

PROCESS     : STEAM BOILER FEEDING WATER PREPARATION SYSTEM

                       (PRE-TREATMENT+REVERSE OSMOSIS SYSTEM)

CAPACITY    : 10 M3/H

YEAR            : 2005

ELBA PRESSURE CASTING IND.A.C.

TUPRAS IZMIT REFINERY

CITY             : IZMIT

PROCESS     : DEMINERALIZATION UNIT AND SYSTEM INTEGRATION

CAPACITY    : 150 M3/H

YEAR            : 2005

LIGNA DÉCOR IND.TRA.A.C.

CITY             : ISTANBUL

PROCESS    : ENPENYE PLANT BATH WATER PREPARATION SYSTEM

                       (REVERSE OSMOSIS SYSTEM)

CAPACITY    : 20 M3/DAY

YEAR            : 2004

UNITED LEATHER IND.TRA..LTD.STI.

           

DAMAT PAINT AND METAL WORKS PRO.MAR.A.C.

           

GAMMA-PAK STERILIZATION IND.TRA..A.C.

ATAER ENERGY OTOPRODUCTION IND.TRA..A.C.

CITY             : IZMIR

PROCESS     : ADVANCED DEIYONIZATION SYSTEM+MIX-BED SYSTEM

CAPACITY    : 24 M3/H ( 1000 M3/DAY)

CONSTRUCTION YEAR   : 2004

BOYTEKS DYE-TEXTILE IND.A.C.

CITY               : CORLU

PROCESS      : DYEBATH PREPARATION SYSTEM

                        (PRE-TREATMENT+REVERSE OSMOSIS SYSTEM)

CAPACITY     : 42 M3/H ( 1000 M3/DAY)

YEAR             : 2004

KURTOGLU LEAD-COPPER IND.A.C.

CITY              : CORLU

PROCESS     : RECYCLE TYPE DEMINERALIZATION SYSTEM

CAPACITY    : 7 M3/H

YEAR            : 2004

PROCESS     : RECYCLE TYPE DEMINERALIZATION SYSTEM

CAPACITY    : 3 M3/H

YEAR            : 2004

PROCESS     : ONE-STAGE SOFTENING SYSTEM

CAPACITY    : 10 M3/H

YEAR            : 2004

PROCESS     : INDUSTRIAL TREATMENT  (CHEMICAL TREATMENT)

CAPACITY    : 13 M3/H

YEAR            : 2004

SANICA RADIATOR PANEL IND.TRA.A.C.

           

POLITEKNIK METAL IND.A.C.

           

BURSEL TEXTILE IND. IMP AND EXP. A.C.

SABANCI DUPONT INDUSTRIAL YARN AND FIBER IND.TRA..A.C.

CITY              : IZMIT

PROCESS     : COOLING AND PROCESS WATER PREPARATION SYSTEM

                        (PRE-TREATMENT+REVERSE OSMOSIS SYSTEM+DEGASSER+ 

                        PH ADJUSTMENT SYSTEM)

CAPACITY    : 2X25 M3/H

YEAR            : 2003

ICDAS STEEL ENERGY DOCKS AND SHIPPING A.C.

CITY              : CANAKKALE

PROCESS     : COOLING WATER PREPARATION SYSTEM

                       (PRE-TREATMENT+REVERSE OSMOSIS SYSTEM)

CAPACITY    : 1000 M3/H

YEAR            : 2003

EVPA MARKETING

BOTERSAN – ROZMAS CHUO AUTOMOTIVE IND.A.C.

CITY              : GEBZE

PROCESS     : RECYCLE TYPE DEMINERALIZATION SYSTEM

CAPACITY    : 3 M3/H

YEAR            : 2003

TURKEY SUGAR FACTORY  A.C.ERZURUM  SUGAR FACTORY

CITY              : ERZURUM

PROCESS     : BOILER FEEDING WATER PREPARATION SYSTEM

                        (PRE-TREATMENT SYSTEM +DOSAGE UNIT+TANDEM  SAND FILTER+

                       TANDEM ACTIVATED CARBON FILTER+REVERSE OSMOSIS SYSTEM)

CAPACITY    : 15 M3/H

YEAR            : 2002

           

TURKEY SUGAR FACTORY  A.C.MALATYA  SUGAR FACTORY

CITY               : MALATYA

PROCESS      : BOILER FEEDING WATER PREPARATION SYSTEM

                        (PRE-TREATMENT SYSTEM +DOSAGE UNIT+TANDEM SAND FILTER+

                        TANDEM ACTIVATED CARBON FILTER+REVERSE OSMOSIS SYSTEM)

CAPACITY     : 15 M3/H

YEAR             : 2002

TUP MERCERIZED TEXTILE IND.A.C.

CITY               : LULEBURGAZ

PROCESS      : PROCESS WATER TREATMENT SYSTEM

                        (PRE-TREATED DECATIONIZATION SYSTEM)

CAPACITY     : 250 M3/H

YEAR             : 2002

CAN TEXTILE IND.TRA..A.C.

ALIMEX ALUMINIUM IND.TRA..A.C.

CITY               : AKYAZI

PROCESS      : RECYCLE TYPE DEMINERALIZATION SYSTEM

CAPACITY     : 3 M3/H

YEAR             : 2002

HOBI SOCKS TEXTILE IND.TRA..A.C.

CITY               : ISTANBUL

PROCESS      : DRINKING AND POTABLE WATER SYSTEM                     

                        (PRE-TREATMENT UNIT+REVERSE OSMOSIS                                                                        SYSTEM+ADVANCED TREATMENT )

CAPACITY     : 29 M3/H

YEAR             : 2001

KENMORE REFRIGRATION

CITY              : GEBZE

PROCESS     : PRE-TREATMENT RECYCLE TYPE DEMINERALIZATION SYSTEM

CAPACITY    : 1 M3/H

YEAR            : 2001

SARAY FOUNDRY IND. A.C.

CITY             : ISTANBUL

PROCESS     : INDUSTRIAL TREATMENT  (CHEMICAL TREATMENT)

CAPACITY    : 5 M3/H

YEAR            : 2001

PROCESS     : PRE-FILTRATION RECYCLE TYPE DEMINERALIZATION  SYSTEM

CAPACITY    : 1.5 M3/H

YEAR            :2003

PROCESS     : RECYCLE TYPE DEMINERALIZATION SYSTEM

CAPACITY    : 7 M3/H

YEAR            : 2004

CITY              : ÇERKEZKOY

PROCESS     : INDUSTRIAL TREATMENT  (CHEMICAL TREATMENT)

CAPACITY    : 500 M3/H

YEAR            : 2004

PROCESS     : RECYCLE TYPE DEMINERALIZATION SYSTEM

CAPACITY    : 4 M3/H

YEAR            : 2005

PROCESS     : TANDEM SOFTENING SYSTEM

CAPACITY    : 25 M3/H

YEAR            : 2005

MAN B&W DIESEL AG – BIRLIK ENERGY ELEC.PROD.OTOP.GROUP

CITY              : DENIZLI

PROCESS     : DENIZLI ORGANIZE SANAYI BÖLGESI BOILER FEEDING AND COOLING 

                        WATER PREPARATION SYSTEM  (PRE-TREATMENT UNIT +REVERSE

                        OSMOSIS SYSTEM+SOFTENING  SYSTEM)

CAPACITY    : 33 M3/H

YEAR            : 2001

ELBA PRESS FOUNDRY IND.TRA..A.C.

TURKEY BOTTLE AND GLASS FACTORY A.C.  GLASS FIBER IND.A.C.

CITY             : GEBZE

PROCESS     : DEMINERALIZATION SYSTEM + REVERSE OSMOSIS SYSTEM

CAPACITY    : 7 M3/H

YEAR            : 2000

MODERN ENERGY ELECTRICAL PROD.AND OTOPRODUCTION GROUP A.C.

CITY              : CORLU

PROCESS     : PRE-TREATMENT UNIT+DOSAGE UNIT +TANDEM SAND FILTER+

                       ACTIVATED CARBON FILTER

CAPACITY    : 36 M3/H

YEAR            : 2000

PROCESS     : TWO-STAGE  REVERSE OSMOSIS SYSTEM

CAPACITY    : 25 M3/H

YEAR            : 2000

PROCESS     : TANDEM MIX-BED SYSTEM

CAPACITY    : 60 M3/H

YEAR            : 2000

PROCESS     : MULTILAYER FILTRATION SYSTEM

CAPACITY    : 3X50 M3/H

YEAR            : 2000

PROCESS     : BOILER FEEDING WATER PREPARATION SYSTEM

                       (PRE-TREATMENT UNIT +REVERSE OSMOSIS SYSTEM)

CAPACITY    : 45 M3/H

YEAR            : 2001

PROCESS     : CONDENSER RECYLE TREATMENT SYSTEM (TANDEM MULTILAYER

                        FILTER SYSTEM)

CAPACITY    : 50 M3/H

YEAR            : 2002

PROCESS     : CONDENSER RECYLE TREATMENT SYSTEM (TANDEM MIX-BED SYSTEM)

CAPACITY    : 40 M3/H

YEAR            : 2002

DOGUS CHEMICALS A.C.

TURKEY SUGAR FACTORY  A.C. KIRSEHIR  SUGAR FACTORY

CITY               : KIRŞEHIR

PROCESS      : PRE-TREATMENT UNIT+DOSAGE UNIT+TANDEM SAND FILTER+

                        TANDEM ACTIVATED CARBON FILTER

CAPACITY     : 30 M3/H

YEAR             : 2000

PROCESS      : STEAM BOILER FEEDING SYSTEMS AND REVERSE OSMOSIS SYSTEMS

CAPACITY     : 15 M3/H

YEAR             : 2000

PROCESS      : DRINKING AND TAP WATER REVERSE OSMOSIS SYSTEM

CAPACITY     : 15 M3/H

YEAR             : 2000

PROCESS      : CONDUCTION AND BOILER DOSAGE SYSTEMS

CAPACITY     : 5 M3/H

YEAR             : 2000

MINISTRY OF DEFENCE  ARMY MEDICINE FACTORY

CITY              : ANKARA

PROCESS     : SAND FILTER

CAPACITY    : 5 M3/H

YEAR             : 2000

PROCESS     : ACTIVATED CARBON FILTER

CAPACITY    : 3 M3/H

YEAR             : 2000

PROCESS     : TANDEM SOFTENING SYSTEM

CAPACITY    : 3 M3/H

YEAR            : 2000

PROCESS     : PRE-TREATMENT UNIT + REVERSE OSMOSIS SYSTEM

CAPACITY    : 1.1 M3/H

YEAR            : 2000

PROCESS     : U.V.SYSTEMS +SUBMICRON FEED  AND CONDUCTION  SYSTEM

CAPACITY    : 2 M3/H

YEAR            : 2000

TEKEL TARSUS SUMALIK WINE FACTORY

CITY              : TARSUS

PROCESS     : TANDEM SAND FILTER

CAPACITY    : 30 M3/H

YEAR            : 2000

PROCESS     : TANDEM SOFTENING SYSTEM

CAPACITY    : 15 M3/H

YEAR            : 2000

PROCESS     : DISINFECTION SYSTEMS

CAPACITY    : 15 M3/H

YEAR            : 2000

PROCESS    : DRINKING WATER TREATMENT SYSTEM

CAPACITY    : 15 M3/H

YEAR            : 2000

GUNERCA CHEMICALS  IND. TRA. A.C.

SUZER CENTER

CITY              : ISTANBUL

PROCESS     : TANDEM SAND FILTER

CAPACITY    : 65 M3/H

YEAR            : 2000

PROCESS     : TRIPLEX SOFTENING SYSTEM

CAPACITY    : 21 M3/H

YEAR            : 2000

PROCESS     : TANDEM SOFTENING SYSTEM

CAPACITY    : 17 M3/H

YEAR            : 2000

PROCESS     : DISINFECTION SYSTEMS

CAPACITY    : 17 M3/H

YEAR            : 2000

ROBERT BOSCH

CITY              : BURSA

PROCESS     : RECYCLE TYPE DEMINERALIZATION SYSTEM

CAPACITY    : 10 M3/H

YEAR            : 2000

STROYTRANTSGAZ

CITY              : RUSSIA

PROCESS     : RECYCLE TYPE DEMINERALIZATION SYSTEM

CAPACITY    : 3 M3/H

YEAR            : 2000

MENZOLIT SYNTHETIC REZIN IND.TRA.A.C.

MEY ALCOHOLIC BEVERAGES IND.TRA.A.C.BILECIK BEVERAGE FACTORY

CITY              : BILECIK

PROCESS     : CHLORONATION + SAND FILTER

CAPACITY    : 50 M3/H

YEAR            : 1999

PROCESS     : TANDEM SAND FILTER

CAPACITY    : 15 M3/H

YEAR            : 2000

PROCESS     : SOFTENING SYSTEM

CAPACITY    : 3X30 M3/H

YEAR            : 1999

PROCESS     : PRE-TREATMENT UNIT + REVERSE OSMOSIS SYSTEM

CAPACITY    : 6 M3/H

YEAR            : 1999

ERTEKNIK –  MINISTRY OF DEFENSE

TEKEL ANKARA WHISKY FACTORY

CITY              : ANKARA

PROCESS     : DEMINERALIZATION SYSTEM

CAPACITY    : 5 M3/H

YEAR            : 1999

PROCESS     : PRE TREATMENT UNIT + REVERSE OSMOSIS SYSTEM

CAPACITY    : 6.3 M3/H

YEAR            : 1999

PROCESS     : TANDEM SAND FILTER +TANDEM ACTIVATED CARBON FILTER

CAPACITY    : 42 M3/H

YEAR            : 1999

PROCESS     : TANDEM SOFTENING SYSTEM

CAPACITY    : 3X42 M3/H

YEAR            : 1999

KORUMA CHLOR-ALKALI IND.TRA..A.C.

CITY              : IZMIT

PROCESS     : PRE TREATMENT UNIT + REVERSE OSMOSIS SYSTEM

CAPACITY    : 15 M3/H

YEAR            : 1999

TEKEL IZMIR TOBACCO FACTORY

CITY             : IZMIR

PROCESS     : SAND FILTER + TANDEM SOFTENING SYSTEM

CAPACITY    : 42 M3/H

YEAR            : 1999

PROCESS     : PRE TREATMENT UNIT + REVERSE OSMOSIS SYSTEM

CAPACITY    : 6 M3/H

YEAR            : 1999

PROCESS     : BIOLOGICAL TREATMENT

CAPACITY    : 3X100 M3/DAY

YEAR            : 2000

GRAND HALIC HOTEL

CITY              : ISTANBUL

PROCESS     : TANDEM DEMINERALIZATION SYSTEM

CAPACITY    : 3 M3/H

YEAR            : 1999

                   

SELCOM ASFEN ELEVATOR IND. AND TRA.LTD. STI.

           

VESTEL IND.TRA..A.C.

CITY              : MANISA

PROCESS     : RECYCLE TYPE DEMINERALIZATION SYSTEM

CAPACITY    : 3 M3/H

YEAR            : 1999

ARCELIK LG CLIMA FACTORY

CITY              : GEBZE

PROCESS     : TANDEM DEMINERALIZATION SYSTEM

CAPACITY    : 3 M3/H

YEAR            : 1999

PROCESS     : INDUSTRIAL TREATMENT  (CHEMICAL TREATMENT)

CAPACITY    : 10 M3/H

YEAR            : 1999

ANADOLU ISUZU IND.TRA..A.C.

CITY              : GEBZE

PROCESS     : SAND FILTER+TANDEM ACTIVATED CARBON FILTER+ TANDEM

                       SOFTENING SYSTEM

CAPACITY    : 80 M3/H

YEAR            : 1998

TRAKYA GLASS  IND.A.C.

CITY              : CORLU

PROCESS     : TANDEM SOFTENING SYSTEM

CAPACITY    : 40 M3/H

YEAR            : 1998

ULUSAN ALUMINIUM IND.TRA..A.C.

           

SASA SYNTHETIC FIBER IND.A.C.

           

LVL – GREECE

KNORR – ORSAN IND.TRA..A.C.

CITY              : CORLU

PROCESS      : RECYCLE TYPE DEMINERALIZATION SYSTEM

CAPACITY   : 3 M3/H

YEAR            : 1998

COŞKUNOZ IND.TRA..A.C.

OTOYOL FACTORY

CITY              : ISTANBUL

PROCESS     : RECYCLE TYPE DEMINERALIZATION SYSTEM

CAPACITY    : 2 M3/H

YEAR            :1998

SITTNAK INTERNATIONA SHIPPING  A.C.

CITY              : ISTANBUL

PROCESS     : POTABLE AND DRINKINGING WATER TREATMENT SYSTEM+REVERSE 

                       OSMOSIS SYSTEM

CAPACITY    : 3 M3/H

YEAR            : 1998

TEKEL CANAKKALE KANYAK FACTORY

AABSAL

           

TURKEY BOTTLE AND GLASS FACTORY A.C.  ESKISEHIR FACTORY

CITY              : ESKIŞEHIR

PROCESS     : INDUSTRIAL TREATMENT  (CHEMICAL TREATMENT)

CAPACITY    : 15.4 M3/H

YEAR            : 1998

PROCESS     : PRE TREATMENT+REVERSE OSMOSIS SYSTEM+MIX-BED SYSTEM

CAPACITY    : 12 M3/H

YEAR            : 1998

PROCESS     : DISENFECTION+TANDEM SAND FITLER

CAPACITY    : 50 M3/H

YEAR            : 1998

PROCESS     : TANDEM SOFTENING SYSTEM

CAPACITY    : 20 M3/H

YEAR            : 1998

TURKEY SUGAR FACTORY A.C. YOZGAT SUGAR FACTORY

CITY              : YOZGAT

PROCESS     : BOILER FEED WATER TO PREPARE FOUNDATION           

              (PRE TREATMENT UNIT+TANDEM SOFTENING SYSTEM+2 STAGE

              REVERSE OSMOSIS SYSTEM)

CAPACITY    : 15 M3/H

YEAR            : 1997

           

TURKEY SUGAR FACTORY  A.C. ANKARA  SUGAR FACTORY

CITY              : ANKARA

PROCESS     :BOILER FEED WATER TO PREPARE FOUNDATION           

                       (PRE TREATMENT UNIT+TANDEM SOFTENING SYSTEM+2 STAGE

                       REVERSE OSMOSIS SYSTEM)

CAPACITY    : 15 M3/H

YEAR            :1997

           

TURKEY SUGAR FACTORY  A.C. HORZEM  SUGAR FACTORY

CITY              : UZBEKISTAN

PROCESS     : BOILER FEED WATER TO PREPARE FOUNDATION           

                       (PRE TREATMENT UNIT+TANDEM SOFTENING                                                                     SYSTEM+2 STAGE REVERSE OSMOSIS SYSTEM)

CAPACITY    : 30 M3/H

YEAR            : 1997

TOFAS TURKEY AUTOMOTIVE A.C.

CITY              : BURSA

PROCESS     : ACTIVATED CARBON FILTER

CAPACITY    : 50 M3/H – TANDEM

YEAR            :1997

COLGATE – PALMOLIVE CLEANNESS PRODUCT IND.TRA.A.C.

CITY               : GEBZE

PROCESS      : PRE FILTER-DOSING UNIT + TANDEM SAND FILTER +

                        TANDEM ACTIVATED CARBON FILTER+TANDEM SOFTENING SYSTEM

CAPACITY     : 15 M3/H

YEAR             : 1997

PROCESS      : DOUBLE RANK REVERSE OSMOSIS SYSTEM

CAPACITY     : 8 M3/H

YEAR             : 1997

TURKEY BOTTLE AND GLASS FACTORY A.C.  MERSIN GLASS FACTORY

CITY               : MERSIN

PROCESS      : PRE FILTRATION + DEMINERALIZATION SYSTEM

CAPACITY     : 15 M3/H – TANDEM

YEAR             : 1996

CELIKLER ALUMINIUM SANAYI A.C.

FORA TEXTILE IND. TRA. A.C.

           

ERCIYES HEAT IND. A.C.

           

SEROMA TEXTILE IND.TRA.LTD.STI.

 

DESA ENERGY OTOPRODUCTION GROUP A.C.

E.C.A. VALVES AND FITTINGS IND. A.C.

CITY              : EDIRNE

PROCESS     : INDUSTRIAL TREATMENT  (CHEMICAL TREATMENT)

CAPACITY    : 10 M3/H

YEAR             : 1996

PROCESS     : RECYCLE TYPE DEMINERALIZATION SYSTEM

CAPACITY    : 15 M3/H – TANDEM

YEAR             : 1996

MAHYA REFIGERATOR FACTORY

           

KONSAN JUICE AND FOOD  IND.A.C.

FENIS ALUMINIUM IND.TRA.A.C.

CITY               : ISTANBUL

PROCESS      : RECYCLE TYPE DEMINERALIZATION SYSTEM

CAPACITY     : 5 M3/H – TANDEM

YEAR             : 1995

PROCESS      : RECYCLE TYPE DEMINERALIZATION SYSTEM

CAPACITY     : 2 M3/H

YEAR             : 1997

BEYBO TEKSTIL IND.TRA.A.C.

 

ALTAS ALUMINIUM IND.TRA.A.C.

TURKEY BOTTLE AND GLASS FACTORY A.C. KIRKLARELI FACTORY

CITY               : KIRKLARELI

PROCESS      : PRE FILTER DEMINERALIZATION SYSTEM

CAPACITY     : 10 M3/H – TANDEM

YEAR             : 1995

PROCESS      : INDUSTRIAL TREATMENT  (CHEMICAL TREATMENT)

CAPACITY     : 300 M3/DAY

YEAR             : 1998

INTERMART DUSAKABIN SYSTEMS CERKEZKOY FACTORY

 

DEMSAS METAL IND.TRA.A.C.

 

BILKENT HOLDING

 

GENCER ALUMINIUM IND.TRA.A.C.

OTOKAR BUS CHASSIS IND. A.C.    

CITY              : ARIFIYE

PROCESS     : INDUSTRIAL TREATMENT  (CHEMICAL TREATMENT)

CAPACITY    : 5 M3/DAY

YEAR             : 1995

PROCESS      : INDUSTIAL WASTEWATER TREATMENT + FILTRATION SYSTEM

CAPACITY     : 2 M3/H

YEAR             :

PROCESS      : TANDEM DEMINERALIZATION SYSTEM

CAPACITY     : 2 M3/H

YEAR             : 1999

PROCESS      : RECYCLE TYPE DEMINERALIZATION SYSTEM

CAPACITY     : 2 M3/H – TANDEM

YEAR             : 1999

PROCESS      : IRON-MANGANESE REMOVAL AND SOFTENING SYSTEM

CAPACITY     : 10 M3/H

YEAR             : 2002

ALARKO CARRIER IND.TRA.A.C. ALPOM FACTORY

CITY               : ISTANBUL

PROCESS      : INDUSTRIAL TREATMENT ( CHEMICAL TREATMENT )

CAPACITY     : 3 M3/H

YEAR             : 1995

PROCESS      : RECYCLE TYPE DEMINERALIZATION SYSTEM

CAPACITY     : 2 M3/H

YEAR             : 1995

PROCESS      : RECYCLE TYPE DEMINERALIZATION SYSTEM

CAPACITY     : 3 M3/H

YEAR             : 2005

PROCESS      : INDUSTRIAL TREATMENT ( CHEMICAL TREATMENT )

CAPACITY     : 5 M3/H

YEAR             : 2005

AYKIM CHEMICALS

 

TURKEY BOTTLE AND GLASS FACTORY A.C. PASABAHCE GLASS FACTORY

CITY               : ISTANBUL

PROCESS      : PRE-FILTRATION DEMINERALIZATION SYSTEM

CAPACITY     : 10 M3/H

YEAR             : 1994

           

MED UNION CONTAINERS A.C.

CITY               : IZMIR

PROCESS      : REVERSE OSMOSIS SYSTEM

CAPACITY     : 6 M3/H

YEAR             : 1994

PROCESS      : INDUSTRIAL TREATMENT ( CHEMICAL TREATMENT)

CAPACITY     : 6 M3/DAY

YEAR             : 1994

PROCESS      : BIOLOGICAL TREATMENT

CAPACITY     : 120 M3/DAY

YEAR             : 1994

bottom of page