GAZI MAGOSA-DAU SEA WATER DESALINATION PLANTS BUILT-OPERATE-TRANSFERS FOR 15 YEARS
PLACE: CYPRUS
PROCESS: DRINKING AND POTABLE WATER
PREPARING SYSTEM FROM SEA WATER
(SEA WATER INTAKE CONSTRUCTİON + PRE-TREATMENT+REVERSE OSMOSİS SYSTEM+ ENERGY RECOVERY SYSTEM)
CAPACITY: 4000 M3/DAY
CONSTRUCTION YEAR: 2008
BALOCHISTAN, GAWADAR SEA WATER TREATMENT SYSTEM
PLACE: PAKİSTAN
PROCESS: DRINKING AND POTABLE WATER PREPARİNG
SYSTEM FROM SEA WATER (SEA WATER TAKING CONSTRUCTION + PRE-TREATMENT + REVERSE OSMOSIS SYSTEM+ ENERGY RECOVERY SYSTEM)
CAPACITY: 4.000 M3/DAY
CONSTRUCTION YEAR: 2006
EAST MEDİTERRANEAN UNIVERSITY
PLACE : CYPRUS
PROCESS: DRINKING WATER PREPARING
FROM SEA WATER (PRE-TREATMENT UNIT +REVERSE OSMOSIS SYSTEM+ENERGY RECOVERY SYSTEM+ADVANCED TREATMENT)
CAPACITY: 1000 M3/H
CONSTRUCTION YEAR: 2001
KARACHI PORT
PLACE: KARACHI / PAKISTAN
PROCESS: DRINKING AND POTABLE
WATER PREPARING SYSTEM FROM SEA WATER
CAPACITY: 2 X 454 M3/DAY
CONSTRUCTION YEAR: 2010